Which fields in the Timesheet tool can be configured as required, optional or hidden?
Answer
You can set some fields in the Project Timesheet tool as required, optional or hidden. Fields that are not configurable are shown in grey italics and their default setting is noted in the table. See Create new configurable fieldsets.
In the table below:
A GREEN tick (
) indicates the possible setting for the field.A RED 'x' (
) indicates the field cannot be configured to this setting.A field name in GREY italics indicates the field cannot be configured from its default setting.
Labour
Section | Field Name | Required | Optional | Hidden | |
|---|---|---|---|---|---|
General Information | Billable |
|
|
| |
General Information | Classification |
|
|
| |
General Information | Cost Code |
|
|
| |
General Information | Date |
|
|
| |
General Information | Description |
|
|
| |
General Information | Location |
|
|
| |
General Information | Project |
|
|
| |
General Information | Sub job |
|
|
| |
General Information | Time type |
|
|
| |
General Information | Task codes |
|
|
|
Equipment
To sync Equipment timesheets with Site Diary Equipment entries, the configurable fieldset for Site Diary Equipment Entries must match the Equipment fieldset for timesheets.
Section | Field Name | Required | Optional | Hidden |
|---|---|---|---|---|
General Information | Idle hours |
|
|
|
General Information | Operating hours |
|
|
|
General Information | Operator |
|
|
|
General Information | Task code |
|
|
|
