Import a main contract BOQ from a CSV file
Background
To save time from manually adding line item to a main contract's BOQ, you can download a CSV file from your project, add your line item to that file and then import it into Procore.
Things to Consider
Required User Permissions:
'Admin' level permission on the project's main contract tool.
Prerequisites
Before importing, it's important to know how the Enable always editable Bill of Quantities setting works:
When this setting is OFF (default). The commitment must be in draft status to import.
When this setting is ON. The commitment can be in any status to import. However, you cannot replace line item if they have been payment application.
To learn more about imports, see What are the requirements for importing BOQ line item from CSV?
Steps
Download a CSV template
Add line items to a CSV template
Import the completed CSV template to Procore
Download a CSV template
Navigate to the main contract tool.
In the table, click a Number link to open the contract.
Under the General tab, click Bill of quantities.
In the Bill of Quantities card, click Edit.
This places the BOQ into edit modeBelow the table, click Import and choose BOQ from CSV .
This opens the Import bill of quantities from CSV window.

Expand Custom CSV delimiter.
Choose a delimiter for the template file: Comma or Semicolon.
The system's default option is Comma.Click Download CSV template and choose: Blank template or Template with existing line items.
The downloads the selected template to your web browser's configured location.
Add line items to a CSV template
Open the downloaded template in a spreadsheet editor.
Enter the line item data using the appropriate accounting method for the main contract. See How do I set the accounting method for a contract or funding?
Amount. Enter a numeric amount without commas or the pound sign (e.g., 15000); enter '0.00' if there is no monetary amount, as blank cells are not accepted.


