Create a snag list item

Things to Consider

Beta

Please note that some details in this article apply only to users participating in the open beta. Procore administrators can enable the Snag List: Create snag list items from template on web and persist category beta in Procore Explore (US 2 | UK).

  • Snag list items can be assigned to multiple people.

  • To assign a snag list item to a person, the user must:

  • After an initial notification has been sent, selected assignees will receive daily notifications of overdue items via email; email notifications end after 45 days.

  • Snag list item types cannot be created when creating a snag list item. Types must be created by an ‘Admin’ level user in the tool’s configuration settings. See Configure advanced settings: Snag List.

  • Assets:

    Show / hide details

    • Selecting an asset when creating or editing a snag list item, automatically links the item to the asset as a related item.

    • You can click the asset link in the snag list item to view the asset's details.

Prerequisites

Steps

  1. Navigate to your project's Snag List tool.

  2. Click +Create.

  3. Click into the following fields to enter the relevant information.

    Show/Hide Fields

    • Category (Beta feature): If configured for your project, select a category from the drop-down menu.

      • Note: You must select a category to reveal the template field. Currently, the category selection is for tracking purposes only and does not affect the item's workflow.

    • Template (Beta feature): Once a category is selected, select a template from the drop-down menu.

      • Selecting a template automatically populates the trade, snag manager, assignee and final approver fields if they are configured in the template. If the template does not define a value for one of these fields, Procore applies the project's default settings. You can edit any auto-populated values before saving the item.

    • Title: Provide a descriptive title for the snag list item. The item's title is displayed as the title in the list view.

    • Number: Assign a number to the snag list. This number can be a duplicate of one already assigned to another snag list item in your project.

    • Snag manager: Select a snag manager who will oversee the item throughout its entire lifecycle.
      Note: If no snag manager is selected, Procore will automatically list the item's creator as the snag manager.

    • Assignee: Select an assignee who will be responsible for resolving these item.

    • Final approver: Select a final approver who will have the authority to close the item.
      Note: If no final approver is selected, Procore will automatically list the item's creator as the final approver.

    • Location: Use the location drop-down menu to select a location the item impact. Either select from the predefined location or add a new location. See Add a multi-tiered location to an item. This location may be as general as the site location at the first tier or as specific as where on the site the contractor will be working at the second tier. You can add a snag list item to a drawing to indicate the exact location of the snag list item. See Add snag list items to drawings and Use the drawing markup toolbar.

    • Type: Snag list item types help categorise items into related areas or divisions. Select the appropriate type for the item.
      Note: Users with 'admin' permission on the snag list tool can create snag list item types. See Configure advanced settings: Snag list.

    • Due date: Enter or select a date from the calendar for the snag list item to be due.
      Note: The 'due date' field is automatically populated based on the default number of days specified on the Snag List tool's Configure settings page. See Configure advanced settings: Snag List. The due date also respects which days are set as 'working days' for the project. See Set project working days.

    • Priority: Select one of the following to indicate the urgency of the item: Low, Medium, High.

    • Distribution list: You can select a group of users who will be notified of the new item via email once the items have been sent. To create a default distribution list, see See Configure advanced settings: Snag list.

    • Trade: Select the applicable trade from the drop-down menu. Trades are configured at the Company level. See Add or delete trades.

    • Reference: Enter a reference number or keywords in this box. This is an open text field. After the item is created, users can search for matching snag list items by entering the reference number or keyword in the 'Search for snag list item' box in the Snag List log.

    • Cost impact: Select one of the following to indicate if the item will affect the project's cost (i.e. add cost to the project): Yes, Yes (Unknown), No, TBD and n/a.

    • Programme impact: Select one of the following to indicate if the item will affect the project's programme (i.e. delay the project's planned programme): Yes, Yes (Unknown), No, TBD and n/a.

    • Cost code: Associate a cost code with the item. The cost code will automatically populate once you start typing an item listed in your cost codes.

    • Private: Mark this tickbox to make the item private. Items marked as 'Private' are only visible to the item's creator, assignee, distribution list members and all members with 'admin' level permissions on the Snag List tool . To set all new snag list items by default, see Configure advanced settings: Snag List.

    • Description: Enter a detailed description of the item, including information about the issue and its possible resolution.

    • Assets: Select an asset from the Project level asset register to automatically link the asset and snag list item as related items.

    • Attachments: Attach any related files or photos to the item by clicking the Attach files link or attach files from the Document Management tool.

  4. Once you've added all the relevant information, choose from the following options:

    • Click Save to save your item.

    • Click Save and create new to save your item and create a new snag list item.

  5. Once you've created the desired snag list item(s), navigate to the Snag List Home page and send notifications to the assignees and distribution group members of the item(s) by clicking Send all items in the list page banner.

Next Steps

See Also

Loading related articles...