Which fields in the Daily Log tool can be configured as required, optional, or hidden?
Background
Certain fields in the Daily Log tool can be configured as required, optional, or hidden. For example, if you want to make comments required, or hide a section that is not relevant to you and your team, you can configure these preferences in the Company level Admin tool and then apply them to one or more projects.
See Create New Configurable Fieldsets.
Answer
The tables below detail which fields can be configured for sections in the project's Daily Log tool:
Accidents
Call
Daily Construction Report
Delay
Delivery
Dumpster
Equipment
Inspection
Manpower
Notes
Observed Weather Conditions
Plan Revision
Productivity
Quantity
Safety Violation
Visitors
Waste
Work
Note:
A GREEN checkmark
indicates the field can be configured to this setting.A RED 'x'
indicates the field cannot be configured to this setting.A field name in GRAY italics indicates the field cannot be configured from its default setting.
Accidents
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Comentarios |
|
|
|
Empresa involucrada |
|
|
|
Hora |
|
|
|
Minuto |
|
|
|
Parte involucrada |
|
|
|
Call Log
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Call From |
|
|
|
Call To |
|
|
|
End Hour |
|
|
|
End Minute |
|
|
|
Start Hour |
|
|
|
Start Minute |
|
|
|
Daily Construction Report
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Comentarios |
|
|
|
Empresa |
|
|
|
Horas de aprendiz de primer año 1 |
|
|
|
Total de horas de capataz |
|
|
|
Total de horas de operario |
|
|
|
Horas de residente local (ciudad) 1 |
|
|
|
Horas de residente local (condado) 1 |
|
|
|
Horario de minorías 1 |
|
|
|
Otros Total horas |
|
|
|
comercio |
|
|
|
Horario de veteranos 1 |
|
|
|
Mujeres Horas 1 |
|
|
|
1 By default, the following workforce labor types are not included in the Daily Construction Report: Women, Veteran, Minority, First-Year Apprentice, Local (City), and Local (County). In order to have them available for use in a project, you will need to mark them as 'Required' or 'Optional', and apply the settings to one or more projects.
See How do I enable additional workforce labor types for the Daily Log?
Delay
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Comentarios |
|
|
|
Tipo de retraso |
|
|
|
Hora de finalización |
|
|
|
Ubicación |
|
|
|
Hora de inicio |
|
|
|
Delivery
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Contents |
|
|
|
Delivery From |
|
|
|
Time Hour |
|
|
|
Time Minute |
|
|
|
Tracking Number |
|
|
|
Dumpster
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Company |
|
|
|
# Delivered |
|
|
|
# Removed |
|
|
|
Equipment
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Cost Code |
|
|
|
Equipment Name |
|
|
|
Hours Idle |
|
|
|
Hours Operating |
|
|
|
Inspected |
|
|
|
Inspection Hour |
|
|
|
Inspection Minute |
|
|
|
Location |
|
|
|
In Beta
Company Administrators can enable the Improved Equipment Time Tracking in Procore Explore. (US 2 | UK)
This beta allows you to define custom fields for equipment time entries and automatically sync them to the daily log.
Steps: To sync Equipment Timesheets with Daily Log entries, the configurable fieldset for Daily Log Equipment Entries must match the Equipment fieldset for Timesheets.
Inspection
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Comentarios |
|
|
|
área |
|
|
|
Hora de finalización |
|
|
|
Acta de finalización |
|
|
|
Entidad inspectora |
|
|
|
Tipo de inspección |
|
|
|
Nombre del inspector |
|
|
|
Ubicación |
|
|
|
Hora de inicio |
|
|
|
Minuto de inicio |
|
|
|
Manpower
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Comentarios |
|
|
|
Empresa |
|
|
|
Código de coste |
|
|
|
Horas |
|
|
|
Ubicación |
|
|
|
comercio |
|
|
|
Trabajadores |
|
|
|
Notes
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Issue? |
|
|
|
Location |
|
|
|
Observed Weather Conditions
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Promedio |
|
|
|
Comentarios |
|
|
|
retraso |
|
|
|
Tierra/Mar |
|
|
|
precipitación |
|
|
|
cielo |
|
|
|
Temperatura |
|
|
|
Tiempo observado |
|
|
|
Viento |
|
|
|
Plan revision
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Category |
|
|
|
Plan Revision |
|
|
|
Revision |
|
|
|
Title |
|
|
|
Productivity
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Line Item |
|
|
|
Quantity Delivered |
|
|
|
Quantity Put in Place |
|
|
|
Quantity
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Archivos adjuntos |
|
|
|
Comentarios |
|
|
|
Código de coste |
|
|
|
Ubicación |
|
|
|
Cantidad |
|
|
|
Unidades |
|
|
|
Safety Violations
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Compliance Due |
|
|
|
Hour |
|
|
|
Issued To |
|
|
|
Minute |
|
|
|
Safety Notice |
|
|
|
Subject |
|
|
|
Visitors
Nombre de campo | Obligatorio | Opcional | oculto |
|---|---|---|---|
Comentarios |
|
|
|
Fin |
|
|
|
Inicio |
|
|
|
Visitantes |
|
|
|
Waste
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Approximate Quantity |
|
|
|
Disposal Location |
|
|
|
Disposed By |
|
|
|
Hour |
|
|
|
Material |
|
|
|
Method of Disposal |
|
|
|
Minute |
|
|
|
Work
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Hours |
|
|
|
Rate |
|
|
|
Reimbursable |
|
|
|
Resource |
|
|
|
Showed? |
|
|
|
Workers |
|
|
|