Configure Settings for Procore Tools in Data Extracts
Background
In the Data Extracts 2.0 tool, you can configure the settings of various Procore tools when creating and editing extracts.
Things to Consider
Additional Information:
No settings are available for the Directory, Documents, Photos, Change Orders, and Models tools.
Attachments associated with the Change Orders tool's items are included in the extract by default.
All data for the Models tool is included in the extract by default.
Configure Settings
You can configure the settings of various Procore tools to specify the exact content you want to include in your extract.
Procore Tools | Settings | Steps |
---|---|---|
Action Plans | Attachments | Select one of these options:
Note: Attachments associated with action plan items are included as separate files by default. |
Bidding Change Events Correspondence Emails Forms Incidents Inspections Meetings Prime Contract Invoices Prime Contracts Punch List Purchase Orders Subcontractor Invoices Subcontracts | Include Attachments | Unmark this checkbox if you do not want to include attachments associated with items in the extract. Note: By default, this checkbox is selected. |
Daily Log | Log Status | Select the status of logs to be included in the extract. Note: 'Approved' and 'Rejected' statuses are included by default. You can remove them if required. |
Daily Log | Log Type | Select the type of logs to be included in the extract. Note: All log types are included by default. You can remove them if required. |
Daily Log | Exclude Empty Days | Unmark this checkbox to include days when the daily logs are not completed. Note: By default, this checkbox is selected. |
Daily Log | Include Attachments | Unmark this checkbox to exclude attachments associated with daily log items in the extract. Note: By default, this checkbox is selected. |
Daily Log | Month & Year | Use the < and > buttons to navigate to the required month and year. Note: By default, the current month and year are selected. |
Daily Log | Today | Click Today to view the daily logs starting from today onwards. |
Drawings | Include Attachments | Unmark this checkbox to exclude attachments associated with items in the extract. Note: By default, this checkbox is selected. |
Drawings | Revision | Select one of these options:
|
Submittals | Include Attachments | Unmark this checkbox to exclude attachments associated with items in the extract. Note: By default, this checkbox is selected. |
Submittals | Revision | Select one of these options:
|
Observations | Include Attachments | Unmark this checkbox to exclude attachments associated with Observation items in the extract. Note: By default, this checkbox is selected. |
Observations | Include Linked Drawings | Mark this checkbox to include drawings linked with Observation items in the extract. Note: Linked drawings are not included by default. |
RFI | Include Attachments | Unmark this checkbox to exclude attachments associated with RFI items in the extract. Note: By default, this checkbox is selected. |
RFI | Include Official Response Only | Unmark this checkbox to include RFIs regardless of whether they have an official response in the extract. Note: By default, this checkbox is selected. |
Specifications | Revision | Select one of these options:
|