Which fields in the Daily Log tool can be configured as required, optional, or hidden?
Background
Certain fields in the Daily Log tool can be configured as required, optional, or hidden. For example, if you want to make comments required, or hide a section that is not relevant to you and your team, you can configure these preferences in the Company level Admin tool and then apply them to one or more projects.
See Create New Configurable Fieldsets.
Answer
The tables below detail which fields can be configured for sections in the project's Daily Log tool:
Accidents
Call
Daily Construction Report
Delay
Delivery
Dumpster
Equipment
Inspection
Manpower
Notes
Observed Weather Conditions
Plan Revision
Productivity
Quantity
Safety Violation
Visitors
Waste
Work
Note:
A GREEN checkmark
indicates the field can be configured to this setting.A RED 'x'
indicates the field cannot be configured to this setting.A field name in GRAY italics indicates the field cannot be configured from its default setting.
Accidents
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Commentaires |
|
|
|
Entreprise impliquée |
|
|
|
Heure |
|
|
|
Minute |
|
|
|
Partie impliquée |
|
|
|
Call Log
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Call From |
|
|
|
Call To |
|
|
|
End Hour |
|
|
|
End Minute |
|
|
|
Start Hour |
|
|
|
Start Minute |
|
|
|
Daily Construction Report
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Commentaires |
|
|
|
Compagnie |
|
|
|
Heures des apprentis de première année 1 |
|
|
|
Heures totales du contremaître |
|
|
|
Nombre total d’heures de compagnon |
|
|
|
Heures des résidents locaux (ville) 1 |
|
|
|
Heures des résidents locaux (département) 1 |
|
|
|
Heures réservées aux minorités 1 |
|
|
|
Autres heures totales |
|
|
|
Commerce |
|
|
|
Heures des vétérans 1 |
|
|
|
Heures des femmes 1 |
|
|
|
1 By default, the following workforce labor types are not included in the Daily Construction Report: Women, Veteran, Minority, First-Year Apprentice, Local (City), and Local (County). In order to have them available for use in a project, you will need to mark them as 'Required' or 'Optional', and apply the settings to one or more projects.
See How do I enable additional workforce labor types for the Daily Log?
Delay
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Commentaires |
|
|
|
Type de retard |
|
|
|
Heure de fin |
|
|
|
Emplacement |
|
|
|
Heure de début |
|
|
|
Delivery
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Contents |
|
|
|
Delivery From |
|
|
|
Time Hour |
|
|
|
Time Minute |
|
|
|
Tracking Number |
|
|
|
Dumpster
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Company |
|
|
|
# Delivered |
|
|
|
# Removed |
|
|
|
Equipment
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Cost Code |
|
|
|
Equipment Name |
|
|
|
Hours Idle |
|
|
|
Hours Operating |
|
|
|
Inspected |
|
|
|
Inspection Hour |
|
|
|
Inspection Minute |
|
|
|
Location |
|
|
|
In Beta
Company Administrators can enable the Improved Equipment Time Tracking in Procore Explore. (US 2 | UK)
This beta allows you to define custom fields for equipment time entries and automatically sync them to the daily log.
Steps: To sync Equipment Timesheets with Daily Log entries, the configurable fieldset for Daily Log Equipment Entries must match the Equipment fieldset for Timesheets.
Inspection
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Commentaires |
|
|
|
Aire |
|
|
|
Heure de fin |
|
|
|
Minute de fin |
|
|
|
Entité d’inspection |
|
|
|
Type d’inspection |
|
|
|
Nom de l’inspecteur |
|
|
|
Emplacement |
|
|
|
Heure de début |
|
|
|
Minute de début |
|
|
|
Manpower
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Commentaires |
|
|
|
Compagnie |
|
|
|
Code de coût |
|
|
|
Heures |
|
|
|
Emplacement |
|
|
|
Commerce |
|
|
|
Travailleur |
|
|
|
Notes
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Issue? |
|
|
|
Location |
|
|
|
Observed Weather Conditions
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Moyenne |
|
|
|
Commentaires |
|
|
|
Retarder |
|
|
|
Sol/Mer |
|
|
|
Précipitation |
|
|
|
Ciel |
|
|
|
Température |
|
|
|
Temps observé |
|
|
|
Vent |
|
|
|
Plan revision
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Category |
|
|
|
Plan Revision |
|
|
|
Revision |
|
|
|
Title |
|
|
|
Productivity
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Line Item |
|
|
|
Quantity Delivered |
|
|
|
Quantity Put in Place |
|
|
|
Quantity
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Pièces jointes |
|
|
|
Commentaires |
|
|
|
Code de coût |
|
|
|
Emplacement |
|
|
|
Quantité |
|
|
|
Unités |
|
|
|
Safety Violations
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Compliance Due |
|
|
|
Hour |
|
|
|
Issued To |
|
|
|
Minute |
|
|
|
Safety Notice |
|
|
|
Subject |
|
|
|
Visitors
Nom du champ | Obligatoire | Optionnel | Caché |
|---|---|---|---|
Commentaires |
|
|
|
Fin |
|
|
|
Commencer |
|
|
|
Visiteurs |
|
|
|
Waste
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Approximate Quantity |
|
|
|
Disposal Location |
|
|
|
Disposed By |
|
|
|
Hour |
|
|
|
Material |
|
|
|
Method of Disposal |
|
|
|
Minute |
|
|
|
Work
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Hours |
|
|
|
Rate |
|
|
|
Reimbursable |
|
|
|
Resource |
|
|
|
Showed? |
|
|
|
Workers |
|
|
|