View Change Events

Background

After a change event is created, you can follow the steps below to view it in the project's Change Events tool.

Things to Consider

  • Required User Permissions:

    • 'Read Only' level permissions or higher on the project's Change Events tool.

Steps

  1. Navigate to the project's Change Events tool.

  2. Optional: At the top of the change event, you have these options:

    • Click the Edit button at the top of the page to edit the change event. To learn more, see Edit Change Events.

    • Click the Export button and choose the PDF option from the drop-down menu. To learn more, see Export Change Events.

    • Click the Vertical Ellipsis and choose the Email option from the drop-down menu. To learn more, see Email Change Events.

    • Click the Vertical Ellipsis and choose the Clone option from the drop-down menu. To learn more, see Clone Change Events.

View the General Information

In the General tab, the General Information card lets you view basic information about the change event:

  •  Note

    If the change event is linked to a T&M ticket (see Create a Change Event from a T&M Ticket or Add a T&M Ticket to a Change Event), Procore displays the T&M ticket in ths Description field these options:

    • Download PDF. To download a PDF copy of the T&M Ticket to your computer, click this link.

    • View Ticket. To open the T&M Ticket in the project's T&M Tickets tool, click this link.

  •  Note

    If the change event is linked to a T&M ticket, any file attachments from the T&M ticket is transferred to the 'Attachment' section when the change event is created so you can download it.

View Line Items

The Line Items card on an individual change event lets you perform different viewing and editing functions. To learn about your options, see (Beta) View the Change Events Line Items View.

Change Event Data Columns

Change Event General Information

Change Event Detail

Production

Revenue

Cost

Budget