Add Materials to a Container
In Beta
This feature is currently in beta for select Procore customers.
This feature is currently in beta for select Procore customers.
When storing your material inventory, you can store materials at a stationary location, or you can store them in a container that is mobile and can move from one location to another. You can issue materials for use from the container, or you can issue the container, and all the stored materials at one time.
If adding materials to a container from a shipment, the shipment must be 'Pending'.
You can add materials to a container in the following places:
Shipment or Receipt
Transfer
If the container already exists and is marked as 'reusable', you can select the container in the 'To Location' field for the line items.
Navigate to the project's Materials tool.
Click the Control tab.
Click the Shipments or Receipts sub tab.
Click the shipment number or receipt number.
Select items.
Under 'Document Line Items', click the caret icon for the line item and select Add to Container.
To add multiple items, mark the checkboxes, then click the hamburger
icon and select Add to Container.
Create a new container or add materials to an existing container.
Create a Container
Click the New tab.
Enter the container information.
Enter the Container Name.
Enter the Container Type.
Move the Reusable Container toggle
to the ON position if additional materials can be added to the container at a later time.
Optional: Enter the Sensor information.
Optional: Enter the Description.
Optional: Enter the Container Weight.
Optional: Enter the Container Dimensions.
Click Create.
Locate the new line item for the container.
Update the To Location field for the container to assign the container to a location.
Add to an Existing Container
Click the Existing tab.
Select the container, then click Add.
If needed, you can remove items from a container before releasing the shipment or posting the receipt. Follow these same steps and instead of selecting 'Add to Container', select Remove from Container.
Navigate to the project's Materials tool.
Click the Control tab.
Click the Transfers sub tab.
Click the transfer number.
In the 'Documents Line Items' header, click the hamburger
icon and select Add to Container.
Create a new container or add materials to an existing container.
Create a Container
Click the New tab.
Enter the container information.
Enter the Container Name.
Enter the Container Type.
Move the Reusable Container toggle
to the ON position if additional materials can be added to the container at a later time.
Optional: Enter the Sensor information.
Optional: Enter the Description.
Optional: Enter the Container Weight.
Optional: Enter the Container Dimensions.
Click Create.
Locate the new line item for the container.
Update the To Location field for the container to assign the container to a location.
Add to an Existing Container
Click the Existing tab.
Select the container, then click Add.
If needed, you can remove items from a container before releasing the shipment or posting the receipt. Follow these same steps and instead of selecting 'Add to Container', select Remove from Container.
Loading related articles...