Which fields in the Daily Log tool can be configured as required, optional, or hidden?
Background
Certain fields in the Daily Log tool can be configured as required, optional, or hidden. For example, if you want to make comments required, or hide a section that is not relevant to you and your team, you can configure these preferences in the Company level Admin tool and then apply them to one or more projects.
See Create New Configurable Fieldsets.
Answer
The tables below detail which fields can be configured for sections in the project's Daily Log tool:
Accidents
Call
Daily Construction Report
Delay
Delivery
Dumpster
Equipment
Inspection
Manpower
Notes
Observed Weather Conditions
Plan Revision
Productivity
Quantity
Safety Violation
Visitors
Waste
Work
Note:
A GREEN checkmark
indicates the field can be configured to this setting.A RED 'x'
indicates the field cannot be configured to this setting.A field name in GRAY italics indicates the field cannot be configured from its default setting.
Accidents
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
备注 |
|
|
|
涉及的公司 |
|
|
|
小时 |
|
|
|
分钟 |
|
|
|
相关方 |
|
|
|
Call Log
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Call From |
|
|
|
Call To |
|
|
|
End Hour |
|
|
|
End Minute |
|
|
|
Start Hour |
|
|
|
Start Minute |
|
|
|
Daily Construction Report
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
备注 |
|
|
|
公司 |
|
|
|
第一年学徒学时 1 |
|
|
|
领班总工时 |
|
|
|
雇佣工总工时 |
|
|
|
本地居民(城市)工时 1 |
|
|
|
本地居民(郡/县)工时 1 |
|
|
|
少数族裔小时 1 |
|
|
|
其他总工时 |
|
|
|
贸易 |
|
|
|
退伍军人工时 1 |
|
|
|
女性学时 1 |
|
|
|
1 By default, the following workforce labor types are not included in the Daily Construction Report: Women, Veteran, Minority, First-Year Apprentice, Local (City), and Local (County). In order to have them available for use in a project, you will need to mark them as 'Required' or 'Optional', and apply the settings to one or more projects.
See How do I enable additional workforce labor types for the Daily Log?
Delay
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
备注 |
|
|
|
延误类型 |
|
|
|
结束时间 |
|
|
|
地点 |
|
|
|
开始时间 |
|
|
|
Delivery
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Contents |
|
|
|
Delivery From |
|
|
|
Time Hour |
|
|
|
Time Minute |
|
|
|
Tracking Number |
|
|
|
Dumpster
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Company |
|
|
|
# Delivered |
|
|
|
# Removed |
|
|
|
Equipment
Important
To sync Equipment Timesheets with Daily Log entries, the configurable fieldset for Daily Log Equipment Entries must match the Equipment fieldset for Timesheets.
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Cost Code |
|
|
|
Equipment Name |
|
|
|
Hours Idle |
|
|
|
Hours Operating |
|
|
|
Inspected |
|
|
|
Inspection Hour |
|
|
|
Inspection Minute |
|
|
|
Location |
|
|
|
Inspection
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
备注 |
|
|
|
面积 |
|
|
|
结束时间 |
|
|
|
结束分钟 |
|
|
|
检查任务实体 |
|
|
|
检查任务类型 |
|
|
|
检查员姓名 |
|
|
|
地点 |
|
|
|
开始时间 |
|
|
|
开始分钟 |
|
|
|
Manpower
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
备注 |
|
|
|
公司 |
|
|
|
成本编号 |
|
|
|
营业时间 |
|
|
|
地点 |
|
|
|
贸易 |
|
|
|
工人 |
|
|
|
Notes
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Issue? |
|
|
|
Location |
|
|
|
Observed Weather Conditions
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
平均 |
|
|
|
备注 |
|
|
|
延误 |
|
|
|
地面/海洋 |
|
|
|
降水 |
|
|
|
蓝天 |
|
|
|
温度 |
|
|
|
观察时间 |
|
|
|
风 |
|
|
|
Plan revision
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Category |
|
|
|
Plan Revision |
|
|
|
Revision |
|
|
|
Title |
|
|
|
Productivity
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Line Item |
|
|
|
Quantity Delivered |
|
|
|
Quantity Put in Place |
|
|
|
Quantity
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
附件 |
|
|
|
备注 |
|
|
|
成本编号 |
|
|
|
地点 |
|
|
|
数量 |
|
|
|
单位 |
|
|
|
Safety Violations
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Compliance Due |
|
|
|
Hour |
|
|
|
Issued To |
|
|
|
Minute |
|
|
|
Safety Notice |
|
|
|
Subject |
|
|
|
Visitors
字段名称 | 必填 | 选填项 | 隐藏 |
|---|---|---|---|
备注 |
|
|
|
结束 |
|
|
|
开始 |
|
|
|
访客 |
|
|
|
Waste
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Approximate Quantity |
|
|
|
Disposal Location |
|
|
|
Disposed By |
|
|
|
Hour |
|
|
|
Material |
|
|
|
Method of Disposal |
|
|
|
Minute |
|
|
|
Work
Field Name | Required | Optional | Hidden |
|---|---|---|---|
Attachments |
|
|
|
Comments |
|
|
|
Hours |
|
|
|
Rate |
|
|
|
Reimbursable |
|
|
|
Resource |
|
|
|
Showed? |
|
|
|
Workers |
|
|
|