Create an Instruction (Android)

Things to Consider

  • Required User Permissions:

    • 'Standard' or 'Admin' level permissions on the project's Instructions tool.

  • You can configure what items are created with the quick createicon-plus-quick-create-mobile2.pngicon, see Configure Quick Create Settings.

Steps

  1. Open the Procore app on an Android mobile device and select a project.
    Note: This loads the Tools screen for the project.

  2. Tap the quick createicon-plus-quick-create-mobile2.pngicon and select Instruction.
    OR
    Tap the Instructions tool and tap the createicon-plus-quick-create-mobile2.pngicon.

  3. Complete the following fields as necessary:
    Note: An asterisk (*) indicates the field is required.

    • Camera/Attachments: Tap Camera or Attachments if you want to add a photo or file to the instruction.

    • Title*: Enter a title for the instruction.

    • Type*: Select the instruction type.
      Note: The instruction types that appear in the list depend on the types that have been added for the project in the Instructions tool's Configure Settings.

    • Status*:

      • Draft: Select Draft if you want the instruction to be saved as a draft so that it is not yet sent out to recipients.

      • Issued: Select Issued if you want the instruction to be issued to the contacts in the 'Attention' and 'Distribution' lists by email after saving.
        Note: After an instruction has been saved as 'Issued', you cannot set it back to 'Draft'.

    • Description: Enter a description for the instruction.

    • Instruction From: Select the person that the instruction was received from.

    • Attention:

      • Select one or more contacts from the People, Companies, and Groups tabs that you want to issue the instruction to.

      • Tap Done to confirm your selection and return to all fields.

    • Distribution:

      • Select one or more contacts or distribution group to be notified of the instruction.

      • Tap Done to confirm your selection and return to all fields.

    • Date Received: Select the date that the instruction was received.

    • Trades:

      • Select one or more trades that are associated with the instruction.

      • Tap Done to confirm your selection and return to all fields.

    • Schedule Impact: Select Yes, Yes (Unknown), No, TBD or N/A to indicate whether there is a schedule impact.

    • Cost Impact: Select Yes, Yes (Unknown), No, TBD or N/A to indicate whether there is a cost impact.

    • Private:

      • Tap the toggle ONicon-toggle-on-2-android.pngto set the instruction to Private so that it can only be viewed by 'Admin' level users and those selected in the 'Attention' and 'Distribution' fields.

      • Tap the toggle OFFicon-toggle-off-android.pngif you want the instruction to be visible to all users with 'Read Only' or higher permissions to the project's Instructions tool.

  4. Tap Save.