What is the difference between a catalogue, group and item in the cost catalogue for Estimating?
Background
There are three different levels of organisation in the cost catalog, starting with the highest to lowest level: catalog, group and item. Groups and item can also be copied or moved from one area to another as needed.
Answer
These three levels are defined below:
Catalogue: A catalogue is the main folder to organise groups and item for materials.
Group: A group within a catalogue that contains item.
Item: An item exists within a group or catalogue. Items can be labelled as the following types: Part, Assembly, Other, Equipment, Subcontractor, Travel or Labour.
You might need to create a new catalogue to best organise materials for a project. Within that catalogue, you can add a group that serves as a subfolder to organise even further. From a catalogue or group, you can then add item such as parts or assemblies.