Update to the new tender management experience

Background

Procore has released Tender management enhanced experience, a streamlined experience for managing tenders in the Tendering tool. This experience includes features such as tender form, tender levelling and an integration with the Procore Construction Network. Until the new experience is made available for all Procore accounts, you can enable it on a project-by-project basis or for all projects in your account.

Things to consider

  • Required User Permissions:

    • To enable the experience at the Project level for a specific project, 'admin' level permission on the project's Tendering tool.

    • To enable the experience for all projects, 'admin' level permissions on the company's Directory tool.

  • Additional Information:

Steps

 Warning!

Update projects to the new tender management experience is final. After you click 'update', projects cannot be switched back to the legacy experience.

Turn on for a specific project

  1. Navigate to the project's Tendering tool.

  2. An 'Introducing Tender Management enhanced experience' banner is shown at the top of the page describing the new tendering experience.

    Bid Packages page with tabs for All, Open, Closed, and Recycle Bin, featuring a banner about Bid Management Enhanced Experience.

  3. Click Update.

  4. Review the information on the 'Update all tender packages?' window.

  5. If you are certain you want to update to the new experience, click Update.
    The project will begin update to the new experience at midnight (12:00am) in the project's timezone. An 'Update in progress' banner is shown within the project while the update is occurring. Avoid editing tender package during this time to avoid any potential of data loss.

Turn on for all projects

 Caution!

Only enable the new experience at the Company level if you are certain you want to update ALL projects on the account to the new experience. Projects cannot be switched back to the legacy experience after agreeing to update.

  1. Navigate to the Company level Admin tool.

  2. Under 'Tool settings', click Tendering.

  3. An 'Introducing Tender Management enhanced experience' banner is shown at the top of the page describing the new tendering experience.

    Bidding settings page with a banner announcing Bid Management Enhanced Experience and an Update button.

  4. Click Update.

  5. Review the information on the 'Update all tender packages?' window.

  6. If you are certain you want to update all projects to the new experience, click Update.
    Each project will begin update to the new experience at midnight (12:00am) in the project's timezone. An 'Update in progress' banner is shown within the project while the update is occurring. Avoid editing tender package during this time to avoid any potential of data loss.

What if I get an error message that I need to add missing cost code?

You cannot upgrade to the Tender Management Enhanced Experience if your project contains tender packages with missing cost codes. If you attempt to join the beta while codes are missing, an error message will prompt you to update them before you can migrate.

This may be a result of the following situations:

  • A tenderer submitted a tender, but did not select a cost code for one or more line items in the Planroom tool.

  • A tender solicitor deleted a cost code that was previously used in a tender.

Steps

From the Company level

  1. Navigate to the Company level Admin tool.

  2. Under 'Tool settings', click Tendering.

  3. Click update in the 'Introducing Tender Management Enhanced Experience' banner.

    Bidding settings page with a banner announcing Bid Management Enhanced Experience and an Update button.

  4. If any project is missing cost codes for tender line items, you will see an 'Action required to update projects' error message with a list of affected projects.

  5. Open each of the affected projects and choose the automatic or manual option for each project.

From the Project level

  1. Navigate to the project's Tendering tool.

  2. Click update in the 'Introducing Tender Management Enhanced Experience' banner.

    Bid Packages page with tabs for All, Open, Closed, and Recycle Bin, featuring a banner about Bid Management Enhanced Experience.

  3. If the project has tender line items missing cost codes, an 'Action required to tender packages' error will appear. Choose whether you want to automatically assign a single cost code to all affected items or update them manually:

    • Automatic:

      1. Click the Select a cost code drop-down menu and select the cost code that you want to add.

        Dialog box for adding missing cost codes to update bid packages, showing a dropdown list of cost code options.

      2. Click Next.

      3. Procore will automatically add any missing cost codes to your affected tender packages and then direct you to the 'Accept terms' page to complete your beta enrolment.

    • Manual:

      1. We recommend opening the Tendering tool in a new tab so that you can refer back to the list of affected tender package and company.

      2. Click View on an affected tender package.

      3. On the tenderers tab, click View on the company that is missing cost codes.

      4. In the tender sheet section, select a cost code to apply to the line item.

        Bid Sheet form with Cost Code dropdown highlighted by a red arrow, showing Total Amount row and Add Line button.

      5. Repeat this process for each affected tender package.

      6. After all missing cost codes have been added and you click Update in the banner again, you will be taken to an 'Update all tender packages' message.