View the Workflows side panel for variations

Background

The Workflows side panel lets you manage workflows consistently across Procore. In the Variations tool, open this panel directly from a contract or commitment variation's sidebar to view its active status and step history replacing the old, tool-specific panel.

Things to Consider

  • Required User Permissions:

    • 'Read Only' level permissions or higher on the project's Variations tool.

  • Additional Information:

    • The Workflows side panel is available for the following variation types:

      • Commitment variation

      • Potential variation

      • Variation request

      • Subcontractor variations (SCO)

    • To start a workflow, click Start workflow on the variation item page.

    • You must assign an active workflow to the variation.

Steps

  1. Navigate to the project's Variations tool.

  2. Locate the variation you want to view.

  3. Click its Number link to open it.

  4. In the sidebar, click the Start workflow.

  5. View the following information in the panel:

    1. Active workflow status: View the workflow's current step and status.

    2. Step history: Click Previous step to view a list of previous workflow steps, along with the date, time and user who performed each action.