Add plan revision entries (Android)
Background
The Plan revisions section allows you to add information for tracking project plans based on revision number, title and category. It also provides a dedicated space for entering comments.
Things to Consider
Required User Permissions:
To create entries:
'Standard' or 'admin' level permissions on the project's Site Diary tool.
To create pending entry as a collaborator:
'Read Only' or 'Standard' permissions to the Site Diary tool with the 'Collaborator entry only' granular permission enabled on your permissions template.
See Create Site Diary entries as a collaborator.
Additional Information:
Procore recommends that you use the Drawings tool to track plan revisions and changes to the project's drawings.
This action can be performed offline. Tasks performed offline sync with Procore once a network connection is reestablished.
Steps
Open the Procore app on an Android mobile device and select a project.
The Tools screen loads, displaying all tools available for this project.Tap the date to select the calendar day for which you want to create a new entry.
Tap
to create a new entry.Tap Plan revisions.
Tap into the following fields to enter the relevant information:
Note: Click the caret icon > to expand and v to collapse the field names and their descriptions below.
Tap Save.
The diary entry is created or added.
Click Fix errors to navigate to the first empty required field (if the required fields are empty or blank).
Click Next field or Previous field to view other empty fields. Once all required fields are filled, you are able to create or save the form.