Update prefilled costs on a main contract payment application

Background

When project costs change, you can update prefilled values on an owner invoice to ensure your Schedule of Values (SOV) reflects current cost data. The Update Pre-Fill feature allows you to review and manage pending cost changes before applying them to an invoice.

Things to Consider

  • Required User Permissions:

    • 'Standard' or 'admin' level permissions on the project's Payment Applications tool.

  • Payment application status requirements:

    • The main contract payment application must be in draft or Revise and resubmit status.

  • Additional Information:

    • Once a cost item is prefilled to a main contract payment application, it is locked to that payment application and cannot be prefilled into another main contract payment application on the project.

    • Update prefill will not overwrite manually entered values on the Bill of Quantities (BOQ); the Computed Adjustments line reconciles differences between prefilled and billed amounts.

    • Newly selected cost attachments automatically sync to the payment application's attachment card upon saving.

    • Choosing No for update cost saves your preference so Procore will not prompt you for that specific cost on future refreshes unless you manually switch it back to Yes.

Steps

Step 1. Open the update pre-fill review screen

  1. Navigate to the project's Payment Applications tool.

  2. Click the owner tab.

  3. Click the payment application number you want to update.

  4. On the Bill of Quantities (BOQ) tab, click Edit.

  5. In the table header toolbar, click Update pre-fill.

Note

A badge indicates the count of pending cost change. For example, Update pre-fill (3). If no cost have changed, the button displays without a count.

Step 2: Review and filter cost changes

  1. In the update pre-fill slide-out window, view the pending cost items.

    • Default view: By default, the table filters to show only New and update item. Clear the filter if you want to inspect all project cost.

    • View switcher: Toggle between Cost source view (grouped by subcontractor contract or direct cost) or Main contract payment application line item view (grouped by BOQ accounting line).

  2. Review the indicators in the Change and Amount columns.

Column / indicator

Description

Change

Displays the item's status:
• New: A newly approved cost source available for billing.
• Update: An existing prefilled cost whose upstream amount has changed.
• Removed: A previously prefilled cost that is no longer eligible/approved.
• Not prefilled: An available cost that was previously omitted.
• No change: Cost amount remains identical to the initial prefill.

Amount change indicators

Green/Red directional icons and hover tooltips show whether the cost increased or decreased compared to the current payment application value.

Step 3: Accept or decline updates

  1. For New cost: Mark the tickbox next to the line item or group to include it on the payment application.

  2. For update cost: In the update column, select Yes to apply the update amount or select No to retain the existing billed value.

    Tip

    If you select No, Procore remembers your preference and will not prompt you for this specific cost on future refreshes unless you switch it back to Yes.

  3. Click Save.