Things to know
Background
Each of Procore's available ERP connectors perform the basic function of syncing data between the ERP system and Procore, usually in the same way as other connectors. However, each connector has a unique set of items it can sync and the way those items are synced will vary based on how that ERP system and its corresponding integration are built to function.
MRI platform X®, like all ERP integrations, has some key considerations, limitations and things to know about how each Procore object is synced. Those considerations, limitations and things to know are outlined in the table below according to tool or item being synced.
Things to know about the MRI platform X® Connector
Procore item or setting | Considerations, limitations and requirements |
|---|---|
Configuration settings & sync programme |
|
Cost codes/cost types | Add cost code to import to Procore
|
Work breakdown structure (WBS) |
|
Companies | Adding an MRI Platform X® company to the Procore Directory
|
Projects |
|
Commitments |
|
Commitment variation | Accept or reject a CV for export to MRI platform X®
|
Subcontractor payment applications |
|
Direct Costs | Import direct costs and payment application payments across all projects from MRI Platform X® to Procore
|