Add a My Time Entry (Android)

Things to Consider

  • Required User Permissions

  • Procore support zero (0) hour entry so your team can easily log time off and per diem.

  • Adding a My Time entry is a separate from clocking in and out.

  • Customers can limit the cost code and cost type options that can be selected.

  • Procore automatically syncs your My Time entries across the Site Diary, Company Timecard, Project and Company Timesheets tools.

  • You can configure what items are created with the quick create Icon Plus Quick Create Mobile2 icon, see Configure Quick Create Settings.

  • This action can be performed offline. Tasks performed offline sync with Procore once a network connection is reestablished.

Prerequisites

Steps

  1. Open the Procore app on an Android mobile device and select a project.

  2. Initiate a My Time entry.

    • Tap the quick create Icon Plus Quick Create Mobile2 icon and select My time.

    • Tap the My Time tool and tap the create Icon Plus Quick Create Mobile2 icon.

  3. Enter the following information:

    • Date: Enter a date for the time entry.

    • Cost code: The budget code associated with the time entry.

    • Time type: The type of pay being entered.

    • Billable: Select whether the entry is billable or not.

    • Description: Enter a more detailed description of the time entry.

  4. If the timesheet tool is enabled, the following fields will be available:

    • Project: Select the project you are currently working on.

    • Codes

      • Task code: A time-entry selector based on your company’s configured work breakdown structure and project setting.

        Notes
        • The options shown to users are filtered by admin controls (for example, cost type limits, Budget-item restrictions and active/inactive budget code status).

        • Applied filters are saved for future entries.

      • Cost code: The budget code associated with the time entry.

    • Classification: If the company has enabled the classifications feature on the project, select one from the list.

    • Sub job: If the company has enabled sub jobs on the project, select one from the list.

    • Location: Select the location where the work is being performed.

    • Time

      • Total time: The total time worked for the day.

      • Start time: The time the resource started working.

      • Stop time: The time the resource stopped working.
        Note: You will only see the Start and Stop fields if you have configured your setting to show these fields.

      • Lunch time: The amount of time taken for a lunch break.
        Notes:

        • The amount of time selected will be subtracted from the total time.

        • This field is only available if start time and stop time is enabled.

    • Add line: Click this option to create extra line items on a time entry.

  5. Tap Save.