Configure settings for Procore tools in project archives
Background
In the Project Archive tool, you can configure the setting of various Procore tools when creating and editing extracts.
Things to Consider
Additional Information:
No setting are available for the Directory, Documents, Photos and model tools.
Attachments associated with the Variations tool's items are included in the archive by default.
All data for the model tool is included in the archive by default.
Configure Settings
You can configure the setting of various Procore tools to specify the exact content you want to include in your archive.
Procore tools | Settings | Steps |
|---|---|---|
Action Plans | Attachments |
|
Action Plans | File structure | Select one of these options:
Note: Attachments associated with action plan items are included as separate files by default. |
Tendering
| Include attachments | Clear this tickbox if you do not want to include attachments associated with items in the archive. Note: By default, this tickbox is selected. |
Site Diary | Log status | Select the status of logs to be included in the archive. Note: 'Approved' and 'Rejected' statuses are included by default. You can remove them if required. |
Site Diary | Log type | Select the type of logs to be included in the archive. Note: All log types are included by default. You can remove them if required. |
Site Diary | Exclude empty days | Clear this tickbox to include days when the Site Diaries are not completed. Note: By default, this tickbox is selected. |
Site Diary | Include attachments | Clear this tickbox to exclude attachments associated with Site Diary items in the archive. Note: By default, this tickbox is selected. |
Site Diary | Month & year | Use the < and > buttons to navigate to the required month and year. Note: By default, the current month and year are selected. |
Site Diary | Today | Click Today to view Site Diaries from today onward. |
Document Management | File structure | Select one of the following options:
|
Document Management | Version | Select one of the following options:
|
Document Management | Saved views | Select which documents from the project's Document Management tool to include in the archive based on their saved views.
|
Drawings | Markup | Select one of the following options:
|
Drawings | Export options | Clear the Include Sketches tickbox to exclude sketches associated with drawing items in the archive. Note: By default, this tickbox is selected. |
Drawings | Revision | Select one of these options:
|
Inspections | Include | Mark the Related items and their attachment tickbox to include linked items and their corresponding attachments in the archive. |
Submittals | Attachment type | Select one of these options:
Note: All types of attachment are included by default. |
Submittals | Revision | Select one of these options:
|
Observations | Include attachments | Clear this tickbox to exclude attachments associated with observation items in the archive. Note: By default, this tickbox is selected. |
Observations | Include linked drawings | Mark this tickbox to include drawings linked with observation items in the archive. Note: Linked drawings are not included by default. |
RFI | Include attachments | Clear this tickbox to exclude attachments associated with RFI items in the archive. Note: By default, this tickbox is selected. |
RFI | Include official response only | Clear this tickbox to include RFIs regardless of whether they have an official response in the archive. Note: By default, this tickbox is selected. |
Specifications | Revision | Select one of these options:
|
Variations | Contract type | Select one of the following options:
Note: Only main contract variations are included by default in the archive. |
Variations | Export options | Mark the Include potential variations tickbox to include potential variations (PVs) for MCVs and CVs in the archive. |
See Also
Loading related articles...