Data change log

Below are the latest data update to 360 Reporting.

Recent changes

360 Reporting: August data release (coming soon - 18/08/2026)

360 Reporting - breaking changes

Procore has removed the following objects:

  • Commitment line item: tax code

  • Commitment variation line item: tax code

  • Direct cost line item: tax code

  • Main contract line item: tax code

  • Main contract variation line item: tax code

  • Subcontractor payment application: Total tax

Show/hide data change log

Procore update the following objects:

  • Tender item:

    • Tender section type

  • Tender vendor:

    • Aggregate limit

    • Average contract value

    • EMR

    • Health and safety programme

    • Health and safety manager contact

    • COMPASS Q score

    • Exceptions

    • Qualification Expiration Date

    • Qualification Status

    • currency

    • Annual revenue

    • Single limit

    • Union status

  • Company granular permissions:

    • Timecard: Create clock in / clock out time for My Time timecard entry

    • Timecard: Can edit previously created My Time timecard entry

    • Timecard: Manually create My Time timecard entries

    • Workflow: Assign templates to projects accessible to user

    • Workflow: Replace assignees

    • Workflow: Create and edit workflow templates

    • Workflow: Delete workflow templates

    • Workflow: View workflow template

  • Company (vendors):

    • Aggregate limit

    • Average contract value

    • EMR

    • Health and safety programme

    • Health and safety manager contact

    • COMPASS Q score

    • Exceptions

    • Qualification Expiration Date

    • Qualification Status

    • currency

    • Annual revenue

    • Single limit

    • Union status

  • Coordination issue:

    • Workflow members

  • Daily hazard analysis:

    • Assignees

    • Date created

    • Created By

    • ID

    • Date prepared

    • Description

    • Emergency contact

    • Emergency Contact Phone

    • Evacuation route

    • Eye wash location

    • First aid location

    • Item number

    • Status

    • Title

    • Required permits & procedures

    • Required PPE

    • Date Updated

  • Daily hazard analysis signatures:

    • ID

    • Is signed

    • Signed at

    • Logged in user

    • Signer name

    • Signer type

  • Daily hazard analysis work steps:

    • Control measures

    • ID

    • Hazard types

    • Risk assessment

    • Scope of Work

    • Work step number

  • Site Diary delay:

    • Cost Code

  • Direct cost:

    • Assigned to current workflow step

    • Workflow assignment duration (days)

    • Current workflow response

    • Current workflow step due date

    • Current Workflow Step

  • Incidents:

    • Current Workflow Step

    • Current workflow step due date

  • Observations:

    • Current workflow step due date

    • Current Workflow Step

    • Assigned to current workflow step

    • Workflow assignment duration (days)

    • Current workflow response

  • Project permissions:

    • Assets

  • Projects:

    • Project message

    • Project message title

  • Main contract payment application adjustments:

    • Previous materials stored

    • New materials stored

    • Total retention released

  • Scheduling activity:

    • Approver

    • Assignee

  • Subcontractor payment application line item:

    • Materials presently stored from previous

  • assignments:

    • resource_type

  • requests:

    • resource_type

360 Reporting: July data release (21/07/2026)

Show/hide data change log

Procore update the following objects:

  • Document management placeholder:

    • Created at

    • Created By

    • Deleted at

    • Deleted by

    • Discipline

    • ID

    • Name

    • Originator

    • Overdue by

    • Placeholder assigned

    • Placeholder due date

    • Placeholder overdue

    • Placeholder status

    • Type

    • Reason for deletion

    • Is recycled

    • Revision

    • Submitted at

  • Equipment rate:

    • Column type

    • Created at

    • Created By

    • Description

    • Equipment category

    • Equipment type

    • Name

    • Rate category

    • Value

    • Resource category

    • Unit of Measure

    • Update at

    • Updated By

  • Equipment timecard entry with rates:

    • Created at

    • Currency ISO code

    • Deleted at

    • Equipment cost

    • Is deleted

    • Quantity

    • Rate

    • Update at

  • Labour rate:

    • Class code

    • Classification

    • Column type

    • Created at

    • Created By

    • Description

    • Name

    • Rate category

    • Value

    • Resource category

    • Unit of Measure

    • Update at

    • Updated By

  • Project permissions:

    • Assets

  • Projects:

    • Project message

    • Project message title

  • Rate table:

    • Created at

    • Created By

    • Description

    • Effective date

    • Expiration Date

    • Is active

    • Name

    • Resource category

    • Update at

    • Updated By

  • Timecard entry with rates:

    • Created at

    • Currency ISO code

    • Deleted at

    • Is deleted

    • Labour cost

    • Rate

    • Update at

  • Incident root cause analysis:

    • Attachment count

    • Contributing behaviour

    • Contributing condition

    • Date created

    • Hazard

    • ID

    • Investigation details

    • Root cause description

    • Date Updated

    • Work activity

  • Incident witness statement:

    • Date captured

    • Signature captured by

    • Witness signature

  • Inspection response:

    • Date created

    • Date Updated

    • Is custom

    • Name

    • Date Updated

  • Inspection template items:

    • Date created

    • Has observation requirement

    • Has photo requirement

    • Position number

    • Response set

    • Response type

    • Section

    • Section position

    • Date Updated

  • Inspection templates:

    • Assigned projects

    • Date created

    • Created By

    • Description

    • Type

    • Type group

    • Active

    • Is Project level

    • Is synced from company

    • Name

    • Origin template name

    • Project count

    • Trade

    • Date Updated

  • Timecard entry:

    • Clock in on-site

    • Clock out on-site

    • Lunch clock in on-site

    • Lunch clock out on-site

  • Direct cost line item:

    • Billable status

    • Prefilled to payment application

    • Prefilled to line item ID

  • Main contract payment application adjustments:

    • Adjustment ID

    • Adjustment Amount

    • Description

    • Date created

    • Date Updated

  • Subcontractor payment application line item:

    • Billable status

    • Prefilled to payment application

    • Prefilled to line item ID

360 Reporting: June data release (16/06/2026)

Show/hide data change log

Procore update the following objects:

  • Tender item:

    • Tender item description

  • Coordination issue:

    • Private

  • Incident:

    • Type

  • Payment requirements configurations:

    • Previous payment application unconditional lien waiver signed

  • Payment requirements:

    • Previous payment application unconditional lien waiver signed

  • RFI external RFI:

    • Created Date

    • External RFI subject

    • ID

    • Update date

  • Inspection templates: (deferred)

    • Name

    • Origin template name

    • Description

    • Type

    • Type group

    • Trade

    • Created By

    • Is Project level

    • Is synced from company

    • Active

    • Project count

    • Assigned projects

    • Date created

    • Date Updated

  • Inspection template items: (deferred)

    • Section

    • Section position

    • Position number

    • Response set

    • Response type

    • Has observation requirement

    • Has photo requirement

    • Date created

    • Date Updated

  • Inspection response: (deferred)

    • Name

    • Is custom

    • Date created

    • Date Updated

  • Equipment rate: (deferred)

    • Column type

    • Date created

    • Created By

    • Description

    • Equipment category

    • ID

    • Equipment type

    • Name

    • Rate category

    • Resource category

    • Unit of Measure

    • Date Updated

    • Updated By

    • Value

  • Labour rate: (deferred)

    • Class code

    • Classification

    • Column type

    • Date created

    • Created By

    • Description

    • ID

    • Name

    • Rate category

    • Resource category

    • Unit of Measure

    • Date Updated

    • Updated By

    • Value

  • Rate table: (deferred)

    • Date created

    • Created By

    • Description

    • Effective date

    • Expiration Date

    • Is active

    • Name

    • ID

    • Resource category

    • Date Updated

    • Updated By

  • Application activity: (deferred)

    • Activity type

    • API call count

    • ID

    • App type

    • Application ID

    • Application name

    • Date

    • Day ID

    • Embedded usage

    • Http method

    • Tool category

360 Reporting: May data release (19/05/2026)

Show/hide data change log

Procore update the following objects:

  • Asset:

    • Asset code

    • ID

    • Asset name

    • Asset type code

    • Asset type name

    • Company ID

    • Date created

    • Created By

    • Description

    • Latitude

    • Location

    • Longitude

    • Note

    • Project ID

    • Scope

    • Status

    • Trade

    • Date Updated

    • Updated By

  • Asset attachment:

    • ID

    • Asset attachment type

    • Date created

    • Created By

    • Description

    • File name

    • Project ID

    • Date Updated

    • Updated By

  • Crew Equipment:

    • Company ID

    • Created at

    • Crew id

    • Crew lead name

    • Crew name

    • Equipment ID

    • Equipment name

    • Project ID

    • Update at

  • Equipment project association:

    • Company ID

    • Created By

    • Created Date

    • Deleted by

    • Deleted date

    • Equipment ID

    • Project ID

    • Project Name

  • Project roles:

    • Is active

  • Planned vs actual summary:

    • Project

    • Cost Code

    • Week start date

    • Week end date

    • Work week

    • Total actual hours

    • Total planned hours

    • Variance hours

    • Variance %

    • Timecard entry count

    • Contributing employee count

  • Worker certification gaps:

    • ID

    • Tags name

    • Effective date

    • Expire date

    • Gap type

  • Workflow instance:

    • Workflow instance ID

    • Company ID

    • Project ID

    • Item tool

    • Template name

    • Template version

    • Status

    • Duration

    • Created By

    • Updated By

    • Date started

    • Date completed

    • Date created

    • Date Updated

  • Workflow step:

    • Workflow step ID

    • Company ID

    • Project ID

    • Name

    • Due Date

    • Date created

    • Date Updated

    • Date completed

    • Completion duration days

    • decision

    • Decision type

    • Is current step

    • Overdue

    • Conditional value

    • Conditional actual value

  • Workflow step assignees:

    • ID

    • Company ID

    • Project ID

    • Assignee ID

    • Aligned to decision

    • Completion duration

    • Date created

    • Invited by

    • Required to respond

    • Response

    • Response comment

    • Response submitted date

    • role

    • Date Updated

    • Name

  • Subcontractor payment application line item:

    • Materials retention this period (£)

  • Incident root cause analysis:

    • Attachment count

    • Contributing behaviour

    • Contributing condition

    • Date created

    • Hazard

    • ID

    • Investigation details

    • Root cause description

    • Date Updated

    • Work activity

360 Reporting: April data release (21/04/2026)

Show/hide data change log

Procore update the following objects:

  • Projects:

    Note

    The reporting columns listed below for projects are visible to all users but currently only populated for select customers. Due to the limited rollout of project features, you may see null or zero values until they are enabled for your account.

    • Estimated budget

    • Priority

  • Document management:

    • Authored By

    • Classification

    • Date Authored

    • Description

    • Discipline

    • ID

    • Document stage

    • Size

    • Format

    • In Active Workflow

    • Location

    • Name

    • Number

    • File name

    • Originator

    • Project Stage

    • Is recycled

    • Deleted on

    • Deleted by

    • Reason for deletion

    • Revision

    • Status

    • Submitted to Drawings tool

    • Type

    • Date Updated

    • Updated By

    • Date Uploaded

    • Uploaded By

    • Volume / System

    • Current Workflow Step

    • Current workflow step due date

    • Assigned to current workflow step

    • Workflow assignment duration (days)

    • Current workflow response

  • Observation assignees:

    • Company (vendor) name

    • Name

    • Date created

    • ID

  • Task:

    • Is origin

  • Daily Timecard and assignments:

    • Employee name

    • Project

    • Work week

  • Equipment project log:

    • Ended by

    • Equipment ID

    • Project Name

    • Started by

  • RFI :

    • Company (vendor) name

  • RFI Ball in Court:

    • Company (vendor) name

  • Direct cost:

    • Accounting date

    • Payment due date

    • Discount date

    • Payment status

    • Billed amount

    • ERP latest status

    • ERP updated at

    • ERP user name

    • Tool origin

360 Reporting: March data release (17/03/2026)

Show/hide data change log

Procore update the following objects:

  • Estimate layer group

    • Group multiplier

    • Total quantity

    • Unit of Measure (quantity)

  • Estimate layer

    • Catalogue number

    • Cost catalogue item

    • Manufacturer

    • Supplier

    • Total cost /Sq Ft

    • Total Equipment cost

    • Total material cost

    • Total quantity

    • Total subcontractor cost

    • Total travel cost

    • Unit of Measure (labour time)

    • Unit of Measure (quantity)

  • Coordination issue watcher

    • Company (vendor) name

    • ID

    • Date created

    • Name

  • Daily timecards and assignments

    • Assignment count

    • Company ID

    • Daily assignment hours

    • Daily timecard hours

    • Daily timecards and assignments ID

    • Date

    • Employee ID

    • Is current week

    • Is missing timecard

    • Missing hours

    • Project ID

    • Week end date

    • Week number

    • Week start date

  • Timecard entry

    • Employee name

  • Payment requirement settings

    • Payment application signed

  • Payment requirement

    • Payment application signed

  • Material

    • Company ID

    • Project ID

    • Item name

    • Item description

    • Item UoM

    • Total required quantity

    • Total shipped quantity

    • Total ordered quantity

    • Total received quantity

    • Total available quantity

    • Total issued quantity

    • ID

    • Date created

    • Updated By

  • Materials shipment

    • Company ID

    • Project ID

    • Shipment line number

    • Shipped quantity

    • Shipment line UoM

    • Shipment forecast delivery date

    • Shipment state

    • Shipment final date

    • Shipment line UUID

    • Shipment line item UUID

    • ID

    • Shipment line link

    • Date created

    • Updated By

  • Materials receipt

    • Company ID

    • Project ID

    • Receipt line number

    • Receipt line condition

    • Received date

    • Received quantity

    • Receipt line UoM

    • Receipt document status

    • Receipt posted date

    • Receipt location

    • Receipt UUID

    • ID

    • Receipt line item UUID

    • Receipt line link

    • Date created

    • Updated By

  • Materials purchase order

    • Company ID

    • Project ID

    • Purchase order number

    • Vendor

    • Purchase order line number

    • Purchase order line ordered quantity

    • Purchase order line UoM

    • Purchase order final date

    • Purchase order document state

    • Contract delivery date

    • Estimated delivery date

    • ID

    • Date created

    • Updated By

360 Reporting: February data release (17/02/2026)
Important

If you have selected a custom field from an incident record as a column or filter, that field will be dropped (removed) from the report and it must be added back. This change is necessary to resolve an issue with custom fields not displaying across all incident record types.

Show/hide data change log

Procore update the following objects:

  • Main contract payment application line item

    • Gross amount plus tax

    • Net amount plus tax

    • Tax amount

    • Tax code

  • Main contract payment application

    • Gross amount plus tax

    • Net amount plus tax

    • Tax total

    • Taxable amount

  • Subcontractor payment application line item

    • Gross amount plus tax

    • Net amount plus tax

    • Tax amount

    • Tax code

  • Subcontractor payment application

    • Gross amount plus tax

    • Net amount plus tax

    • Tax total

    • Taxable amount

  • Contact

    • Job Title

  • Project

    • Store number

  • Commitment

    • Payment application contacts

  • Tax

    • Active date

    • Created By

    • Created on

    • Description

    • Payment application tax application

    • Rate

    • Status

    • Tax code

    • ID

  • Site Diary delay

    • Company (vendor) name

  • Site Diary delivery

    • Company (vendor) name

  • Site Diary Equipment

    • Company (vendor) name

  • Site Diary inspection

    • Company (vendor) name

  • Site Diary note

    • Company (vendor) name

  • Site Diary observed weather condition

    • Company (vendor) name

  • Site Diary phone call

    • Company (vendor) name

  • Site Diary plan revision

    • Company (vendor) name

  • Site Diary quantity

    • Company (vendor) name

  • Site Diary programmed work

    • Company (vendor) name

  • Site Diary visitor

    • Company (vendor) name

  • Scheduling activity

    • Calendar name

    • Constraint date

    • Constraint type

    • Date created

    • Created By

    • Deadline date

    • Deadline variance

    • Duration

    • Duration display unit

    • Duration unit

    • Finish date

    • Is actual finish

    • Is actual start

    • Is critical

    • Is placeholder

    • Note

    • Sibling position

    • Parent ID

    • Percent Complete

    • Resources

    • Crew size

    • ID

    • Programme ID

    • Start Date

    • Activity name

    • Total float'

    • Display ID

    • Date Updated

    • Company (vendor) name

  • Scheduling relationship

    • Date created

    • Created By

    • Dependency type

    • From activity

    • Is active

    • lag

    • Lag display unit

    • Programme ID

    • ID

    • To activity

    • Date Updated

  • Scheduling type

    • Date created

    • Created By

    • Imported data date

    • Is active

    • Name

    • Programme ID

    • Start Date

    • Type

    • Date Updated

  • Employees

    • Contact ID

  • Labour allocations

    • Created By

  • Coordination issue watcher

    • ID

    • Name

    • Company (vendor) name

    • Date created

  • Commitment variation line item

    • Estimated tax

    • Tax code

  • Commitment variation request

    • Total estimated tax

    • Taxable amount

  • Commitment variation

    • Total estimated tax

    • Taxable amount

  • Commitment line item

    • Estimated tax

    • Tax code

  • Commitment potential variation

    • Total estimated tax

    • Taxable amount

  • Commitment

    • Total estimated tax

    • Taxable amount

  • Main contract variation line item

    • Estimated tax

    • Tax code

  • Main contract variation request

    • Total estimated tax

    • Taxable amount

  • Main Contract Variation

    • Total estimated tax

    • Taxable amount

  • Main contract line item

    • Estimated tax

    • Tax code

  • Main Contract Potential Variation

    • Total estimated tax

    • Taxable amount

  • Main Contract

    • Total estimated tax

    • Taxable amount

360 Reporting: January data release (20/01/2026)

Show/hide data change log

Procore update the following objects:

  • Subcontractor BOQ

    • ID

    • Amount

    • Description

    • BOQ position number

  • Tender package

    • Tender Manager

    • Tender submission notifications

  • Equipment timecard entry

    • Idle hours

  • Labour allocation

    • Created By

    • Date created

    • Date Updated

  • Budget Code

    • Budget code status

360 Reporting: December data release (16/12/2025)

Procore update the following objects:

  • Budget Code

    • Budget code status

  • Site Diary accident

    • Area

  • Site Diary construction

    • Area

  • Site Diary delay

    • Area

  • Site Diary delivery

    • Area

  • Site Diary skip

    • Area

  • Site Diary Equipment

    • Area

  • Site Diary inspection

    • Area

  • Site Diary manpower

    • Area

  • Site Diary note

    • Area

  • Site Diary observed weather condition

    • Area

  • Site Diary phone

    • Area

  • Site Diary plan revision

    • Area

  • Site Diary Productivity

    • Area

  • Site Diary quantity

    • Area

  • Site Diary safety violation

    • Area

  • Site Diary programmed work

    • Area

  • Site Diary visitor

    • Area

  • Site Diary waste

    • Area

  • Equipment telematics

    • Provider name

    • Provider ID

  • Equipment telematics daily summary

    • Active regeneration hours

    • Date

    • Distance

    • ID

    • Fuel used

    • Fuel used last 24

    • Equipment ID

    • Idle hours

    • Idle non operating hours

    • Count

    • Maximum speed last 24

    • Operating hours

    • Power take off hours

  • Incident

    • Assignees

    • Global status

  • Incident assignee

    • ID

    • Company (vendor) name

    • Date created

    • Name

    • Date Updated

  • Incident record

    • Equipment ID

    • Equipment name

  • Labour & equipment productivity

    • Task code

    • Task name

    • Labour estimated hours

    • Labour reported hours

    • Labour reported cost

    • Labour % completion

    • Equipment estimated hours

    • Equipment reported hours

    • Equipment reported cost

    • Equipment % completion

    • Total estimated hours

    • Total reported hours

    • Total reported cost

  • Labour allocation

    • ID

    • Date

    • Hours

    • Created By

  • Main Contract

    • Pending variations

    • Payment application

    • Approved variations

    • Pending revised contract amount

    • Remaining balance

    • Revised contract amount

    • Draft variations

  • Snag list item activity

    • Attachment count

    • Comment

    • Date created

    • Created By

    • ID

    • Status

    • Date Updated

  • RFI

    • Attachment count

360 Reporting: November data release (18/11/2025)

Procore update the following objects:

  • tender

    • Added tender invitation first sent

  • Budget change

    • Added Budget lock status

  • Commitment

    • Added current workflow response

  • Commitment potential variation

    • Added current workflow response

  • Correspondence

    • Added current workflow response

  • Form template

    • Added ID

    • Added name

    • Added description

    • Added date created

    • Added date update

    • Added date archived

  • Inspection item

    • Added attachment count

  • Instruction attention

    • Added name

    • Added ID

  • Instruction distribution member

    • Added name

    • Added ID

  • Maintenance record

    • Added service type

    • Added service duration

    • Added start date

    • Added issue

    • Added notes

  • Main contract payment application

    • Added current workflow response

  • Main Contract

    • Added current workflow response

  • Main Contract Variation

    • Added current workflow response

  • Main Contract Potential Variation

    • Added current workflow response

  • Project

    • Added actual completion date

  • Specification section

    • Added current revision

    • Added issue date

    • Added received date

    • Added revision

  • Subcontractor payment application

    • Added current workflow response

Procore also updated the following objects to support multi-currency:

  • Change event line item

    • Changed contingency

  • Commitment

    • Changed draft variations

    • Changed payment application

    • Changed pending variations

    • Changed pending revised variations

    • Changed remaining balance

    • Changed revised contract amount

    • Changed approved variations

  • Commitment variation

    • Changed current workflow response

360 Reporting: October data release (21/10/2025)

Procore added the following objects:

  • Payment application compliance:

    • Added ID

    • Added name

    • Added type

    • Added status

    • Added notes

    • Added attachment count

    • Added effective date

    • Added expiration date

    • Added last modified by

    • Added last modified date

Procore update the following objects:

  • Assembly part:

    • Added difficulty factor

    • Added labour margin

    • Added total cost

    • Added total labour sales

    • Added unit labour

      Mins

    • Added unit sales

  • Company folder/document:

    • Added file size (bytes)

  • Folder/Document:

    • Added file size (bytes)

  • Inspection:

    • Added

      Respondable

      Item count

  • Form:

    • Added template archived date

  • Inspection:

    • Added group

    • Added reinspected by

    • Added origin

  • Meeting:

    • Added distributed date

    • Added distributed by

    • Added last distributed event

  • observation:

    • Added group

  • Maintenance records:

    • Added service type

    • Added service duration

    • Added start date

    • Added issue

    • Added notes