Things to know

Background

Each of Procore's available ERP connectors perform the basic function of syncing data between the ERP system and Procore, usually in the same way as other connectors. However, each connector has a unique set of items it can sync and the way those items are synced will vary based on how that ERP system and its corresponding integration are built to function.

Sage 300 CRE®, like all ERP integrations, has some key considerations, limitations and things to know about how each Procore object is synced. Those considerations, limitations and things to know are outlined in the table below according to tool or item being synced.

Things to know about the Sage 300 CRE® Connector

Procore item or setting

Considerations, limitations and requirements

Connection

  • When Procore's ERP Integrations tool is configured to work with Sage 300 CRE®, your company's will work with your Procore point of contact to install the on your Sage 300 CRE® server. The synchronisation client is a lightweight, Windows desktop application that establishes a secure network connection between the hh2 cloud service (www.hh2.com), which keeps the data in Sage 300 CRE® and Procore in sync.

  • hh2 Synchronisation client requirements:

    • The hh2 synchronisation client requires Microsoft .NET Framework version 4.8 or higher on the server. Typically, the hh2 synchronisation client requires no special network firewall permission, since the client only uses standard outbound TCP Port 80 and sometimes Port 443 connections, which are commonly used for standard web access. In addition, no inbound connections are required. Standard web technologies like Web Sockets are used to maintain a persistent connection.

    • The hh2 synchronisation client uses specific IP addresses to transfer data to and from Procore. If your organisation restricts outbound traffic to approved IP addresses, ensure the following IP addresses are allowlisted:

      • 52.176.219.119

      • 52.165.20.130

Configuration settings & sync programme

  • Configuration setting

    • ERP direct export:

      • You can enable direct exports without further configuration or use the Workflows tool instead of the accounting approver step to manage the approval flow of an item that is sent to enterprise resource planning. The following three (3) configuration options are available with this feature:

        • Direct export disabled (default). You can keep using your integration the same way with no changes.

        • Direct export enabled, workflows NOT applied. When enabled without applying a workflow to the approval process for a commitment, CV and/or payment application, this feature simply allows these objects to be exported directly to your ERP system when clicking the 'Send to ERP' button on the item in its Project level tool. No approval in the Company level ERP integration tool is required.

        • Direct export enabled, workflows applied. You can enable the Direct export feature and choose to use a workflow for the ERP approval process prior to the 'Send to ERP' step, instead of approving an item for export through the Company level ERP integrations tool.

      • Direct export can be enabled for one or more of the following items:

        • Commitments

        • Commitment variations (CVs)

        • Payment applications

      • Within Procore, any exports to Sage 300 CRE® must be approved by your company's designated accounting approver(s). Any changes to the hh2 synchronisation client typically involves the customer's IT department or company.

    • Automatically add new cost code/cost type combinations and sub job cost code/cost type combinations to Budgets on Sage 300 CRE® integrated projects
      Mark this tickbox if you want Procore to automatically add the cost code/category combo as a new budget line item regardless of whether or not the Budget is locked or unlocked. If the Budget is unlocked, Procore will automatically import the Estimate amount found in Sage 300 CRE® to the Original Budget column. If the Budget is locked, Procore will still add the line item for the new cost code/category combination, but will set the Original Budget column to £0.
      Note: Original Budgeted amounts will not be imported if the Budget is locked.

  • Notes: ​​​​​​

    • An on-demand sync can be performed using a button on the following tabs in the ERP Integrations tool:

      • Standard cost codes & cost types

      • Vendors

      • JOBS

      • Sub jobs

      • Main Contracts

      • Job cost

    • An on-demand sync is NOT available on the Budgets, commitments, commitment variations or main contract variations tabs. Instead, this data must be sent to the ERP Integration tool to be accepted or rejected for export to Sage 300 CRE® by an accounting approver.
      Exception: While an on-demand sync is not available from the Budget tab, Budget data can also be imported from Sage 300 CRE® into Procore. Budgets can be refreshed by doing a cost code refresh in the Project admin work breakdown structure.

    • The hh2 cloud service is a third-party, professional-grade data centre that is maintained and monitored 24/7. An hh2 synchronisation client is installed on your Sage 300 CRE® system and it uses the HTTPS protocol to keep in constant contact with your Sage 300 CRE® data stored in the hh2 data centre. The hh2 synchronisation client also keeps your Procore data 'synced' with the hh2 data centre and system. To be synced with Sage 300 CRE®, the compatible data in Procore must first be sent to the ERP Integration tool for acceptance by an accounting approver. After acceptance, your Procore data is exported to hh2 and then synced with Sage 300 CRE®.

Company level work breakdown structure (WBS)

  • Notes:

    • Custom WBS segments are NOT supported.

    • New cost codes must be created in your ERP system and cannot be created in Procore.

    • If you will be integrating one (1) or more projects with Sage 300 CRE®, you should always enable the 'Available for use on new projects' option.

    • If you want to review the codes on the list, click Edit to open the Sage 300 CRE® standard cost codes page.

    • If a cost code has been deactivated, you cannot add it to a project unless you reactivate it first.

    • Projects using the standard cost code list cannot be integrated with Sage 300 CRE®.

    • The standard cost code list can either be the default list that is included with Procore or a custom cost code list that was imported for your company.

Project level work breakdown structure (WBS)

  • Notes

    • Project level cost codes must be added to the project from the Company level ERP standard cost code list.

    • You can add new WBS codes and cost type assignments in Sage 300 CRE® and then refresh the WBS codes on your project to use the newly added codes.

    • Any Project level cost codes that are not synced will automatically sync with your ERP when exporting your budget.

Companies

  • Import companies to Procore:

    • You can filter companies that are ready for import by company type using the Type filter under the Companies tab on the ERP Integrations page.
      Note: You can filter companies by type, even those without a company type, to be synced to Procore.

  • Notes

    • It's strongly recommended that before adding a new company to Procore from Sage 300 CRE®, you must first try to link any Sage 300 CRE® vendor that already exist in your Procore account's Company level Directory.

  • Recommendations:

    • If you have a vendor record in Sage 300 CRE® that you will not be using in Procore, you should archive it in Procore.

  • Limitations:

    • After a vendor record from Sage 300 CRE® is linked to a company record in Procore, any 'Address' changes are not synced between the two systems unless the 'Vendors will be automatically updated' setting in the Company level ERP Integrations tool is enabled.

      • If this setting is enabled, changes to the company's address or phone number in Sage 300 CRE® will sync with the linked Procore company record to maintain an exact match between the two systems.

      • This setting is available because the 'Address' in Sage 300 CRE® pertains to the vendor's billing address, which may be different from the mailing address that your project management team needs to use for job related Correspondence.

Company insurance

  • Note:

    • Company insurance information is only imported into Procore from Sage 300 CRE® on synced companies. Insurance information is retrieved from the AP vendor insurance (global level) in Sage 300 CRE®. This is an optional setting that can be enabled by enterprise resource planning support.

Projects

  • Limitations

    • Projects that are in-progress or created before connection of the integration cannot be synced. Professional services for assistance with integrating in-progress/pre-existing project records are available for an additional fee.

    • Projects that have already been exported to Sage 300 CRE® cannot be re-imported into Procore. Thus, Budget unit details based on job cost will not be converted for these projects and will not appear on the Budget page.

Sub jobs

  • Prerequisites:

    • When syncing sub jobs, the system will pre-fill the value in the ERP Integrations tool's sub job ID field for accounting approvers.

    • If you want to add a Sage 'Extra' as a Procore 'sub job', a backend feature must be enabled on your company's Procore account. To submit a request to enable this feature, contact your Procore point of contact.

  • Additional Information:

    • You cannot delete a sub job if there are cost codes tied to that sub job.

    • Cost codes and categories that are assigned to a sub job must be maintained in your ERP system (not Procore).

Budget

  • Prerequisites for export from Procore:

    • You must assign a cost type to each project cost code to export your budget, regardless of whether the cost code is included in the budget.

  • Syncing:

    • You can export budgets containing original line items with £0 values from Procore to Sage 300 CRE®.

    • You can sync (import and export) Budget with 'quantity' values for line item between Procore and Sage 300 CRE®.

    • You can re-import or re-export budgets to sync unit details.

    • Budget exported to Sage 300 CRE® can be edited in Procore to add unit details.

    • Syncing unit details associated with estimates, including quantity, unit of measure (UoM) and unit cost for line items in original budgets does not change the revenue or contract amounts. Currently, Procore does not sync production quantities.

  • Restrictions:
    After exporting a Procore budget to Sage 300 CRE®, the following restrictions are in place:

    • You will no longer be permitted to import Sage 300 CRE® budget or job data into Procore.

    • You will not be permitted to unlock the Procore project's Budget tool, unless the following is true:

      • The exported entries have been manually posted to your Sage 300 CRE® system using the Job Cost function. See your Sage 300 CRE® Help system for instructions.

      • The hh2 Sync Client synchronises data between the two systems.
        Note: To confirm that the data is synced between the systems, verify that the 'Original Budget amount' appears in Procore's Job cost report.

Budget changes & estimated cost at completion

  • Additional Information:

    • Line items with a "?" will not allow a user to create a budget change into/from the line item.

    • Once a budget change has been created, it cannot be edited or deleted.

  • Syncing:

    • Budget modifications appear as 'Approved Estimate Changes' and update the 'Imported Estimate'.

    • You can export budget change with 'quantity' values for line items from Procore to Sage 300 CRE®.

    • Syncing unit details associated with estimates, including quantity, Unit of Measure (UoM) and unit cost for line items in budget changes does not change the revenue or contract amounts. Currently, Procore does not sync production quantities.

Commitments

  • Prerequisites:
    Before you can send a commitment to the ERP Integration tool, it must satisfy these prerequisites:

    • ID number. Must be 12 characters or less. This is a Sage 300 CRE® limitation.

    • Title. The title must be 30 characters or less.

    • Contract company. Must be linked to a synced Sage 300 CRE® vendor.

    • Status. For purchase order, the status must be set to 'Approved'. For subcontract, the status must be set to 'Approved' or 'Complete.'

    • Bill of Quantities (BOQ). Must include at least one (1) line item with a Sage 300 CRE® cost code Note: You can only add a line item to the commitment's BOQ if its linked to an existing cost code and category.

  • Additional Information:

    • If desired, you can configure your default setting to use your Procore Contract Number for an exported commitment's Sage ID field. If enabled, the Sage ID will auto-populate with the Procore contract number, however, the value can still be edited.
      Note: Enabling this setting requires 'admin' level permission on the ERP integration tool.

Commitment variation

  • Note:

    • When a synced CV is deleted from Procore, the delete action is captured in the individual item's change history tab.

  • Limitations:

    • You cannot delete an 'Approved' variation. You must change its status to delete it.

    • After a synced CV is unlinked and deleted, the data is permanently removed from the system and cannot be restored.

    • To add a bill of quantities (BOQ) line item to a CV, it must be tied to an existing cost code and category.

    • Sage 300 CRE® has a limitation where a contract line item cannot be modified more than once on any CV. Therefore, if you have a CV that contains more than one modification for the same commitment line item, Procore will automatically sum the amount of the item and send it to Sage 300 CRE® as a single (aggregated) value.

Subcontractor payment applications

  • Prerequisites:

    • Before you can send a payment application from the Commitments tool to the ERP Integrations tool, the payment application must be in the Approved, Approved as noted or Pending owner approval status.

  • Limitations:

    • Currently, tax information is not exported from Procore to Sage 300 CRE®. To include tax information, it needs to be added to the payment application in Sage 300 CRE® after the payment application has been exported from Procore.

  • Additional Information:

    • Some fields in a Procore subcontractor payment application are NOT exported directly to Sage 300 CRE®. Instead, the system first uses those fields to calculate a value and then the calculated value is exported to Sage 300 CRE®.

    • Billing date. This date in Procore is transferred to Sage 300 CRE® as the date on a bill.

    • Accounting method. For purchase orders and subcontracts with an amount-based accounting method, Procore sends the pound amount for each line item to Sage 300 CRE®. For purchase orders and subcontracts with a unit quantity accounting method, Procore sends the quantity payment application for each line item to Sage 300 CRE®.

Main contract payment application

  • Prerequisites:

    • Sage 300 CRE® AR Module. To set up the export main contract payment applications feature for Sage 300 CRE®, the Accounts Receivable (AR) Module must be enabled in Sage 300 CRE®.

    • Payment application status. Before you can send a payment application from the main contract tool to the ERP integration tool, the payment application must be in the Approved, Approved as Noted or Pending owner approval status.

  • Limitations:

    • Procore main contract payment applications can only be exported to Sage Quickbill contracts that are configured for lump sum (Job-level) billing.

  • Additional Information:

    • Some fields in a Procore main contract payment application are NOT exported directly to Sage 300 CRE®. Instead, the system first uses those fields to calculate a value and then the calculated value is exported to Sage 300 CRE®.

    • Billing date. This date in Procore is transferred to Sage 300 CRE® as the date on a bill.

    • Work completed and retention held values will be sent however the retention released this period field will be ignored as the integration does not currently release retention. This process must be completed in Sage within the AR module.

Main Contracts

  • Syncing:

    • You can import main contracts with 'quantity' values for line items from Sage 300 CRE® to Procore.

    • Syncing unit details associated with estimates, including quantity, unit of measure (UoM) and unit cost for line items in main contracts does not change the revenue or contract amounts. Currently, Procore does not sync production quantities.

  • Notes:

    • Main contracts can only be imported to Procore from Sage 300 CRE®.

    • Within your ERP integration settings, ERP admins can enable the ability to designate your main contract as either Unit-based or Amount-based before importing to Procore.

    • To import a main contract from Sage 300 CRE®, you must be running a specific version of Sage 300 CRE®.

    • If you choose to update the main contract in Sage 300 CRE® , you will need to manually sync and re-import your changes to Procore.

    • After the main contract has been imported, budget codes and descriptions can be added to individual line items from the Main Contracts tool under Bill of Quantities.

    • Multiple main contracts set up against a job in Sage 300 CRE® can be imported into a synced Procore main contract.

    • Budget codes are only imported with main contract line items if the contract originates at the 'division' or 'Section' billing level using the Quickbill or Misc Worksheet billing methods.

  • Additional information:
    The 'Re-Import' button is greyed out and unavailable when:

    • The main contract is in an unapproved state.

    • The main contract does not belong to a synced job.

    • The main contract has inadvertently been added to two projects in your company's Procore account.

    • The prime contact has already been synced and there are no new un-synced line items.

  • Limitations:

    • You can import units from Sage 300 CRE® on a main contract that has been previously synced, only if that main contract was originally imported as unit-based and does not have any downstream synced MCVs.

Main contract variations (MCV)

  • Prerequisites to sync:

    • The MCV must be sent to the enterprise resource planning integration tool.

    • If any changes have been made to the main contract in Sage 300 CRE®, ensure that those changes are synced to Procore.

    • Create or update the MCV in Procore.

    • Before you can send an MCV to the ERP integration tool, it must also satisfy these prerequisites:

      • Title. Must be 255 characters or less.

      • Number (#). Must be two (20) characters or less.

      • Status. Must be in the Approved status.
        Note: Users with 'admin' level permission on the ERP integration tool can change the status of an MCV manually within the MCV or accounting approvers can change it by approving it for export through the ERP integration tool.

  • Syncing:

    • You can export MCVs with 'quantity' values for line items from Procore to Sage 300 CRE®.

    • Syncing unit details associated with estimates, including quantity, Unit of Measure (UoM) and unit cost for line items in MCVs, does not change the revenue or contract amounts. Currently, Procore does not sync production quantities.

    • You can sync only revenue details when exporting MCVs for a project from Procore to Sage 300 CRE®. See Configuring MCV export settings for enterprise resource planning integration.

  • Notes:

    • Users who are granted only 'Standard' level permission to the ERP Integrations tool can view information, but do not have sufficient permission to accept/reject MCVs for export.

    • You can only view the 'quantity', 'Unit of Measure (UoM)' and 'unit cost' values for line items in MCVs.

  • Limitations:

    • You cannot export units on an MCV linked to a synced main contract that is designated as amount-based.

Job cost (summary)

  • Syncs summary level job cost information into a custom 'ERP direct costs' column in the appropriate budget view.

  • Note:

    • Consider utilising the Budget tool's 'View direct cost details' granular permission in your permission templates to control who can and cannot click a value in the 'Direct costs' column of a budget view to open a popup window that shows job cost transaction detail in the Budget tool.

Direct cost (transaction detail)

  • Syncs job cost transaction detail into the direct cost tool in Procore. This information is then visible in summary format in a few custom columns you will set up in the appropriate budget view.

  • Requirements for job cost transaction detail:

    • Enable job cost transaction syncing on your project in the Project level admin tool.

    • Set up the desired budget view(s) for your enterprise resource planning-integrated project.

      • Determine which budget view(s) you want to add the recommended job cost transaction columns. You may want to adjust your standard budget view or a custom budget view, depending on your company's configurations.

      • If you have previously configured the sync of job cost summary data, you will need to remove both the existing 'ERP direct cost' calculated column and the 'ERP job to date cost' source column on the budget views that you want to modify to include job cost transaction detail.

Custom settings available on request

  • Vendor insurance sync

  • Billed rate transaction sync

  • Tax group sync

  • (Additional fee) project direct cost accumulator: Group cost types on synced transactions, allowing you to prevent payroll cost types from importing into Procore.