Background

By reviewing automatic Snapshots and past versions, you can easily track programme changes and timeline shifts. Comparing your current programme against a historical version allows you to perform variance analysis and identify slippage early. You can also safely restore the programme to a prior state or download the original imported source file directly from the version stack.


Things to Consider

  • Required permissions:

    • 'Standard' level permissions or higher on the project's Scheduling tool.

  • Additional Information:

    • Restoring a previous version applies historical activity parameters directly against your current project rules, active calendars and work breakdown structure (WBS) groupings.

    • The restored layout may vary slightly from the historical original baseline.

Prerequisites

  • Preparation: Confirm that a master programme file has been successfully imported to activate the historical tracking stack.

Steps

  1. Navigate to the Scheduling tool.

  2. Open either the Project Programme view or the Lookahead tab.

  3. Click the Versions icon on the left-side navigation to open the Version history panel.
    Note: Procore automatically captures a baseline version during every file import, as well as every four hours when manual changes are detected during live editing.

    Scheduling tool version history panel showing options to restore, rename, or compare a past version to the current schedule.
  4. Compare a previous version to the current programme by completing the following sub-steps:

    • Locate the past timeline version you want to evaluate within the panel.

    • Click the vertical ellipsisIcon Ellipsis Vertical icon next to that version.

    • Select Compare to current.

    • Review the blue visual comparison bars on the Gantt chart and look over the dynamic tracking fields in the table grid.

    • Click Close compare mode or Exit compare mode in the top bar to return to the active live programme view.

  5. Capture a customised baseline Snapshot by completing the following sub-steps:

    • Select the Current programme (live) entry at the top of the stack.

    • Enter a distinct custom title into the text field.

    • Click away from the input box text area to save your designated baseline entry

  6. Recover a previous programme state by completing the following sub-steps:

    • Locate your target historical version state within the Version history panel.

    • Click the vertical ellipsis Icon Vertical Ellipsisicon menu next to version state.

    • Select Restore this version.

    • Review the warning modal detailing your rollback parameters.

    • Click Confirm to complete the recovery process and reload the programme view.

  7. Download a source file by completing the following sub-steps:

    • Locate a version created via file import within the Version history panel.

    • Click the vertical ellipsis icon next to the version.

    • Select Download source file.

See Also