View the Change History of a Submittal

Things to Consider

  • Required User Permissions:

    • 'Admin' level permissions on the project's Submittals tool.

Steps

  1. Navigate to the project's Submittals tool.

  2. Locate the desired submittal in the list. Click View.

  3. Click the Change History tab.

    • Date. The date and time the change was made.

    • Action By. The user who performed the change.

    • Changed. Details the change that was made.

    • From. Depending on the change made, this field shows different information. For example, if the status was changed from Open to Closed, this field would show Open.

    • To. Depending on the change made, this field shows different information. For example, if the status was changed from Open to Closed, this field would show Closed.