View Quantities on a Timesheet (Android)

Background

Production quantities are a measurable amount of work on a construction project. For example, cubic yards of concrete, number of light fixtures, or linear feet of piping. In Procore, there are two types of production quantities:

  • Budgeted production quantities refers to the measurable amount a team plans to install on a project.

  • Installed production quantities refers to the actual amount installed on a project by a point in time.

After installed production quantities have been entered in a timesheet, they can be tracked against the imported budgeted production quantities using the Production Quantity Report.

Things to Consider

Prerequisites

Steps

  1. Navigate to the project's Timesheets tool using the Procore app on an Android mobile device.

  2. Tap the timesheet containing the quantity you want to view.

  3. Tap View Quantities.
    timesheets-android-view-timesheet-quantities.png