Update general project information
Things to Consider
Required User Permissions:
You need one of the following:
'Admin' level permissions on the Project level Admin tool.
'Read Only' level permissions or higher on the Project level Admin tool with the 'Manage General' granular permission enabled on your permission template.
Additional Information:
The project information entered on this page may appear in numerous location throughout Procore including when accessing the project in Procore Web and Procore Drive, project-related email sent from Procore, CSV and PDF files exported from the project's tools and others.
Weather data on the project's Home and Site Diary tools are determined by latitude and longitude coordinates entered on this page. See How do I determine the latitude and longitude values of an address?
If your company has enabled the Company level ERP Integrations tool and you have synced data with a third-party accounting solution, a green ERP banner appears on the 'General project information' page to alert you that the project is integrated with an ERP system.
At the bottom of the project's landing page, the following information appears:
Name and email of the person who created the project.
Date and time of the project's creation.
Date and time of the most recent update to the project's details.
Steps
Navigate to the Project level Admin tool.
Under 'Project settings', click General.
Update project information in the following sections as appropriate.
Note: An asterisk (*) in the sections below indicates a required field.Project Information
Project Location
Advanced
Click update to save the changes.
Project Information
Project template. Click the project template name to open the template.
Stage. This represents the stage your project is currently in. Certain stages enable certain actions in Procore (for example, tendering in the tendering stage). See Add custom project stages to your company to add custom stages.
Name*. Enter an updated name for the project if necessary.
Project number. Enter or update the project number for your project.
Project ID. View or copy
the project ID.Description. Enter or update the description of your project.
Work scope. Categorise the work according to scope, such as new construction or renovation/alteration.
Project sector. Categorise the project based on the facility's function or purpose, such as retail, Roadwork or Multifamily.
Delivery method. Define how stakeholders will collaborate across each phase of the project including planning, design and build. For example, design-bid-build, design-build or at-risk construction management.
Logo. Upload, replace or remove a project logo. The project logo will display in the upper-left corner of the project navigation bar as well as in PDF exports, report and project email. See Upload a project logo.
Project photo. Upload or remove a project photo. The project photo will help identify your project on the company's Portfolio and the project's Home pages.
Note: The file should have dimensions of 200 x 100 pixels, must not exceed the 3MB maximum and must be saved in the GIF, JPG or PNG file format.Square footage. Enter or update the total number square feet of your project. This will only be reflected here for informational purposes.
Total value*. This is the total amount of construction work performed, planned or put in place during the project.
Code. Enter a project code to help your team identify and locate the project in Procore. This should be an abbreviation of the 'Project name.'
Note: For projects using the Document Management tool, the 'Code' entered above integrates with the naming standards you specify in the tool's Configure setting page. To learn more, see What is the 'Code' field on the project creation page?Language-Country: Select one of the available language or point-of-view dictionary options from the drop-down list. To learn more about the available options, see What languages are available in Procore? and What tool names and terms are different in Procore for main contractors, owners and specialty contractors?
Type: This represents the type of project. Project types can be added in the Company level Admin tool. See Create custom project types. Select a project type from the drop-down menu.
Tender type: Select the tender type from the list. These selections are managed in the Company level Admin tool. See Add a custom tender type.
Programme: Select the programme to classify your project under. These options are managed in the Company level admin tool. See Add programmes.
Note: You can view your projects by programme using the Programmes tool.Parent project: Select the name of the parent project in Procore from the drop-down list. In Procore, a parent job is a Procore project that has been designated as the 'parent' project for one or more related project(s) in Procore's Portfolio tool. To learn more, see What's the difference between a job, a parent job and a sub job?
Owner type: Select the owner type from the list. These selections are managed in the Company level Admin tool. See Add a custom owner type.
Flag: Choose a project flag colour you want to have appear next to this project in the company's Portfolio tool.
Note: The flag is used for your company's organisational purposes only and does not have any other impact on the project. For example, you can flag all commercial projects as GREEN and all internal projects as RED to easily identify them in your list of projects.Active/inactive:
Click the toggle
to the ON position to set the project to Active.Click the toggle
to the OFF position to set the project to Inactive.
Project Location
Country*. Select the country where the project is located.
Street address. Enter the address of the project's job site.
City. Enter the city where the project is located.
State. Select the state where the project is located.
Zip file. Enter the zip file code for the project. You can enter the number in the 5-digit zip file code format (93013, for example) or in zip file + 4 format (93013-2931, for example).
County. Enter the county where the project is located.
Timezone*. Select the time zone for the project. This time zone will determine time stamps on items throughout the project.
Latitude and Longitude. If you want weather to be populated for the project, enter the exact GPS coordinates of your job site. For more information, see Which weather providers are supported by Procore? and How do I determine the latitude and longitude values of an address?
Region: Select the region for your project. These options are managed in the Company level admin tool. See Add a custom project region.
Office: Choose the office that is managing this project. See Add an office location.
Phone. Enter the phone number of the primary contact for the job site.
Fax. Enter the fax number where fax should be sent for the project.
Dates
Start date*: This represents the date the contract for the project was signed and also will be used to calculate construction volume. Select a new date if necessary.
Actual start date: This represents the actual date that the project started and is displayed on the Portfolio page. Select a date from the calendar to manually update the 'Actual start date'.
Notes:If a programme has been uploaded to the project's Programme tool, this field will inherit the start date value from the uploaded programme. See Upload a Project Programme file to Procore's web application.
If no programme has been uploaded, the field will inherit the value that is entered in the 'start date' field
Completion date*: This represents the date all parties agree the project meets or must meet "practical completion" and also will be used to calculate construction volume. Select a new date if necessary.
Projected finish date: This represents the actual date that the project finished and also will be displayed on the Portfolio page. Select a date from the calendar to manually update the 'Projected finish date'.
Notes:If a programme has been uploaded to the project's Programme tool, this field will inherit the last programme task from the uploaded programme.
If no programme has been uploaded, the field will inherit the value from the ‘completion date’ field
Warranty start date: Select the start date for the construction
.A contract warranty is a legal or implied contract that guarantees any work defects found in the original construction will be repaired during the specified warranty period.
Warranty end date: Select the end date for the construction
.A contract warranty is a legal or implied contract that guarantees any work defects found in the original construction will be repaired during the specified warranty period.
Advanced
Departments: Choose one or more departments of your company that are working on this project. This will be reflected in the Timecard tool, Portfolio tool and additional places throughout Procore depending on your settings. See Add a custom department.
QuickBooks Customer: If your company has an equivalent Quickbooks® desktop project for the project, enter the 'QB Customer Name' for the project exactly as it appears in your Quickbooks® desktop account. This allows you to transfer time entries from Procore to Quickbooks® desktop. See Transfer Procore time entries to QuickBooks® desktop and Export time entries from Procore to import into QuickBooks® software.
Copy Directory from: Select one of the projects in your company's Procore account to copy the user and company information from that project's Directory into your current project's Directory tool. See Copy Directory from one project to another.
Use tax code:
Note
The tax code feature was designed for Procore customers in ANZ or Canada. However, the feature is available to all Procore customers. To learn more, see How can I use tax code on a Procore project?
Do not use tax codes: Select this option if you do not want to use tax codes. This is the default setting for a Procore project.
Company default: Select this option to use the tax code that you specified as your company's default. See Configure tax code settings.
[Custom tax codes]: Select one of the options if your company has created custom tax codes for use in your Procore company account. See Configure tax code settings.
TipHow do we ensure our projects and user apply the same dictionary setting set for our Procore company account? In Procore, different dictionary setting can be applied at the company, project and user level. If you want your project(s) and user(s) to apply the same dictionary setting as your company's Procore account, inform your Project Administrator and end user to always choose the None selected option.
To change the setting for your company's Procore account, your Procore administrator must send an email request to your Procore point of contact.
To change the setting for a specific project, select one of the available options from the 'Language-County' as described above.
To change the setting as an end user, see Change your account language in 'My profile settings'.
To learn more about the options for changing language setting, see Can I change the language of my company, project or user in Procore?
Procore's Drawings tool also allows user to choose the language when scanning drawings. For details, see Can I change the language that Procore scans my drawings for?