Update tender documents

Things to Consider

  • Required user permissions to the project's Tendering tool.

  • Additional Information:

    • Tender packages show a static Snapshot of the attached documents, drawings and specifications from the date and time they were attached.

    • Companies who already received your tendering invitation will have a link to the original tender documents, so you will need to create a Correspondence to alert them of the change. Company who have not yet been invited to tender will see the update tender documents.

 Important!

Tender packages containing more than 100,000 files may lead to degraded application performance.

Steps

Update the selection of files on the tender package

Follow the steps below to add or remove tender files from the Drawings, Documents and Specifications tool.

  1. Navigate to the project's Tendering tool.

  2. Click the name of the relevant tender package.

  3. Click the Documents tab.

  4. Click Edit.

  5. Click the tool that you want to update files from.

  6. Mark a tickbox to add a file.

  7. Clear a tickbox to remove a file.

  8. After you have made your changes, click update.

Update files changed outside of the Tendering tool

If update have been made to the tender documents outside of the tender package (for example, if files were uploaded to your tender folder in the Documents tool), you will see a banner that informs you that changes were made to the files.

Update Bid Files Banner
  1. Navigate to the project's Tendering tool.

  2. Click the name of the relevant tender package.

  3. The Action required banner is shown.

  4. Click Update. This will update the tender files in the tender package to match the update made outside the tender package.

You will see the banner in the following cases:

You will NOT see the banner in the following cases:

  • New document revision is added to the tendering folder(s) in the Documents tool.

  • New documents are added to the tendering folder(s).

  • Drawing revisions are added to the attached set(s).

  • Drawings are moved to a different drawing set.

  • Drawings are moved from one drawing area to another.

  • Specification revisions are added to the attached set(s).

  • An empty document folder is added.

  • Drawings are deleted from the attached set(s).

  • Specifications are deleted from the attached set(s).

  • Documents are deleted from the attached folder(s).

  • All associated documents are deleted from the attached folder(s).

  • All associated drawings are deleted from the attached folder(s).

  • A new document subfolder is added to an attached parent folder where not all subfolders are selected.

Next Steps