Create a main contract PV from a change event
Background
If your company has configured your project to use a two (2) tier variation structure, the change event process requires you to create a potential variation. Then, you will create the MCV from the main contract tool. When you create a PV, the Bill of Quantities (BOQ) will populate with the latest price values.
Things to Consider
Required User Permissions:
'Standard' level permission or higher on the project's change event tool.
AND'Standard' level permissions on the project's Main Contracts tool and the 'Allow Standard level users to create PVs' configuration setting must be enabled on the Main Contracts tool. See Configure settings: Main Contracts.
Additional Information:
Depending on the variation tier configuration setting configured for the Main Contracts tool, potential variations can be transitioned into one (1) of the following items:* For two (2) tier variations, a main contract variation.* For three (3) tier variations, a variation request.* To learn more see, What are the different variation tier setting in Project Financials?
Prerequisites
The change event tool must be turned ON on the project. See Add and Remove Project Tools.
The two (2) tier variation configuration settings must be turned ON the main contract tool. See Configure the number of main contract variation tiers.
The project's main contract must be in the 'Approved' status. See Approve a main contract.
Steps
Navigate to the project's change event tool.
In the table, mark the tickboxes for one (1) or more change event line item(s) to include in the new potential variation.
NoteProcore creates the potential variation's Bill of Quantities (BOQ) using the selected change event line item(s).
Click the bulk actions menu and choose the create main contract PV option. Then choose the appropriate contract option from the sub menu.

In the 'New potential variation' page, complete the following data entry:
Sign with DocuSign®If you have enabled the Procore + DocuSign® integration (see Enable or disable the DocuSign® integration on a Procore project), a tick appears in this box by default. If you do NOT want to collect signatures with DocuSign®, remove the mark.
TipHow do you collect signatures with DocuSign? After the data entry for the item is complete, Procore recommends changing the item's status to 'Out for Signature' before clicking the Complete with DocuSign button to launch the DocuSign® application. If you have not previously signed in, you will be prompted to Log in to DocuSign®. Once you are signed in, you can prepare the DocuSign_®_ envelope for signatures. After the signature process is complete, Procore automatically changes the status of the item to 'Approved' and marks the item as 'Executed'. To learn more, see DocuSign®.