FAQ/Troubleshooting
- At what tier can an upstream collaborator approve a variation?
- Can I create a report to see overdue variations?
- Can I customise the numbering system for financial objects in Procore?
- Can we set the cost basis for new CVs 'Latest cost' or 'Latest price' in the change event tool?
- How are financial line items and budget codes updated across change objects?
- How can I troubleshoot an issue with the Procore web application?
- How can I use tax code on a Procore project?
- How do I change my web browser's default email client for mailto links?
- How do I delete line items in approved variations?
- How do I filter item by multi-tiered location?
- What are "related items" in Procore?
- What are Procore's default change types and change reasons?
- What are Procore's default cost codes?
- What are the default status for variations in Procore?
- What are the different financial line item options for single tool reports?
- What are the different variation tier settings in Project Financials?
- What do the different DocuSign® banners in Procore mean?
- What granular permissions are available for Project level workflows? (Beta)
- What granular permissions are available for the project's Variations tool?
- What happens when 'Restrict non-draft edits to contracts and variations' and 'Enable always editable Bill of Quantities' are both enabled?
- What is a budget code in Procore's WBS?
- What is a downstream collaborator?
- What is a variation?
- What is an upstream collaborator?
- What values pull into a variation BOQ from a change event?
- When do the download links in email sent from Procore expire?
- When does the 'Signature required' column in the Variations tool display the signer's name?
- Which Microsoft Excel file versions can be attached to items in Procore?
- Which Procore project tools support the DocuSign® integration?
- Which Procore tools support work breakdown structure?
- Which Units of Measure are included on Procore's master list?