Permissions

Learn which user permissions are required to take the described actions in this tool.

 Important

Some actions that impact this tool are done in other Procore tools.

| | The action is available on Procore's Web, iOS, and/or Android application. Click to view the article.

icon-mindtouch-table-check.png Users can take the action with this permission level.

icon-mindtouch-table-check-gp.png Users can take this action with this permission level AND one or more additional requirements, like granular permissions.

Action

None

Read Only

Standard

Admin

Notes

Approve or Reject Project Connection Request

Web

check-green2.png

Create an External RFI 360 Report

Web

check-orange-simple.png

check-orange-simple.png

  • Permissions for the RFI tool.

  • Users also need 'Standard' level permissions or higher to the project's 360 Reporting tool.

Configure Advanced Settings

Web

check-green2.png

Disconnect a Connected Project

Web

check-green2.png

Initiate a Request to Connect Projects

Web

check-orange-simple.png

  • Users must also have ‘Read only’ level permissions or higher to the Drawings tool in both the upstream and downstream projects.

Link Internal and External RFIs on a Downstream Project

Web

check-orange-simple.png

+ View External Items

check-orange-simple.png

+ View External Items

check-orange-simple.png

  • Permissions for the RFI tool.

  • Users with Read Only or Standard permissions to the RFI tool must also have the ‘View External Items’ granular permission to the RFIs tool to Link Internal and External RFIs on a Downstream Project.

Publish Drawings to your Downstream Project

Web

check-orange-simple.png

  • Users must also have ‘Admin’ level permissions to the Drawings tool.

Quick Undo a Connected Project

Web

check-green2.png

View External RFIs on a Downstream Project

Web

check-orange-simple.png

+ View External Items

check-orange-simple.png

+ View External Items

check-orange-simple.png

  • Permissions for the RFI tool.

  • Users with Read Only or Standard permissions to the RFI tool must also have the ‘View External Items’ granular permission for RFIs to view connected RFIs.

View Project Connections

Web

check-green2.png

check-green2.png

check-green2.png