Create a tender package from an estimate

 In Beta

This is feature is currently in open beta for our Procore customers. See user guide tendering and estimating integration for more information.

Background

The tendering and estimating integration allows you to create tender package directly from an estimate. By connecting the two experiences, user no longer need to recreate estimates in the Tendering tool. This allows you to send out accurate tender invitations more quickly, saving time in a competitive market. After a tender is awarded, you can update your estimate to reflect the awarded contract(s) with a single click. See User guide tendering and estimating integration.

Things to Consider

  • Required user permissions on the project's Tendering tool.

  • Additional Information:

    • You can create multiple tender packages from the project's estimating tool.

    • Each estimate creates one tender package.

    • A separate tender form is created for each group within an estimate.

    • Within the tender package, a tender form is automatically created for each group in your estimate. Each tender form includes all line items within the group.

    • If you are creating multiple tender packages, you may want to update the name of your tender package to reflect the specific estimate.

Steps

  1. Navigate to the project's Estimating tool.

  2. Click the Estimating tab.

  3. Select your cost item groups:

    • To include everything:

      1. Click Actions.

      2. Select Create tender package.

    • To include specific cost groups:

      1. Mark the tickboxes next to the desired cost item groups.

      2. Click Tendering.

      3. Select Create tender package.

  4. On the How do you want to map your estimate data to the tender package? window, choose how to structure your tender form:

    • Create a tender form for each top level group in the estimate

    • Create a single tender form with sections corresponding to each estimate group

  5. Select your preferred item type:

    • Cost code: Organises line item with your project's cost code. Choose this to track cost accurately and match line item to your Budget.

    • Plain text: Displays line item as custom text without linking them to cost code. Choose this option for item that do not need Budget tracking or for simple, custom line item.

  6. Review and update the tender package information. Refer to the Create a tender package with tender management enhanced experience for detailed field descriptions.

  7. Click Create tender package.

  8. Your tender form will appear on the left to preview what is being created. The following fields are editable:

    • Name

    • Item

    • Description

    • Response field type

      • Unit quantity

      • Amount

      • Include / exclude

  9. Click Create tender forms.