Create main contracts

Background

A is a legal agreement between contracted parties. In a single, two-party contract, the party financing the construction project is called the client, owner or principal. The party being paid to ensure completion of work is called the general, primary or main contractor.

In Procore, you can manage a project with either a single or multiple agreements. If the project is large, has multiple funding sources or involves several clients, divide the scope of work into multiple agreements.

If your company has purchased Procore to manage your construction projects, you can create one (1) or more contracts for each new construction project.

Examples

When to create a single main contract

Most customers who manage their construction projects in Procore create a single contract for a single project. For example, if you are a main contractor, creating a single contract is the simplest way to manage a construction project when it has a single project owner and a single funding source. If you are an owner/developer or an internal main contractor with an upstream approval requirement, you might choose to create a single main contract to handle the upstream contract and payment applications.

When to create multiple main contracts

If a project has multiple owner/client, funding source and/or project delivery methods, you can also choose to create multiple contracts for a single project. If you choose to create multiple contracts in a single Procore project, there are some limitations. For details, see Are there any system limitations when projects have multiple main contracts? Reasons to create multiple contracts include:

  • Multiple clients and funding sources. A project can have multiple funding sources or multiple clients. For example, a specialty contractor might choose to create a separate main contract for each client. Or your construction company might have been contracted to complete work on a project with more than one funding stream, such as a private donor, a public grant, a public authority, bonds, grants, loans or a combination of all these examples. See Configure advanced settings: Main contracts.

  • Multiple stages. A project can be divided into stages. For example, you might require separate contracts for pre-construction, course of construction and aftercare/maintenance.

  • Multiple phases. A project can be portioned into phases. For example, you might require separate contracts for the foundation, plumbing, HVAC and so on.

  • Guaranteed maximum price (GMP) contracts. A project can be fast-tracked or a phased GMP job. For example, you might require multiple contracts for each established scope-of-work package.

  • Construction manager as advisor (CMa) delivery methods. A main contractor operating as a CMa might need to manage multiple contracts between an owner and various contractors.

After you create an agreement, you can then update its Bill of Quantities (BOQ). For details, see Update the bill of quantities on a main contract.

 Tip

Is the Bill of Quantities on the contract similar to the line item on the project's budget? If so, Procore recommends creating the project's budget before the contract. To eliminate repetitive data entry, you can use the main contract tool's import feature to Create the main contract Bill of Quantities from the project budget.

Things to Consider

Prerequisites

Steps

With the required user permission, you can create one (1) or multiple contracts on a Procore project.

 Important
  1. Navigate to the project's Main Contracts tool.

  2. Click Create.
    create-pc

  3. In the General information, do the following:

     Notes
    • There are no required fields when creating a new contract.

    • If you click the Create button without completing any data entry, Procore saves the contract, lists you as its creator and places it in the draft status.

    • Sign with DocuSign©
      If the Procore + DocuSign© integration is enabled, a tick appears by default. Clear the tick from the box if you do NOT want to collect signatures with DocuSign©.

    • Contract #
      Accept the default contract number, enter a new number for this contract or create a custom numbering scheme for this contract and future contracts.

       Notes
      • If you plan to create multiple contracts, Procore assigns new contract numbers in sequential order. For example; 1, 2, 3 and so on.

      • To use a custom numbering scheme, enter any set of alphanumeric characters. Procore assigns numbers in sequential order using your scheme. For example, enter MC-1, MC-01 or MC-001.

    • Owner/client
      Select the project owner or client from the drop-down list.

    • Title
      Enter a descriptive name for the contract.

    • Status*
      Select the current status of the contract. Options include draft, Out for tender, Out for signature, Approved, Complete or Terminated.
      Note:
      To create variations and payment applications, a contract's status must be set to Approved or Complete.

    • Executed*
      Place a mark in this tickbox if the contract has been fully executed.

    • Default retention
      Enter a percentage amount to represent the retention amount for your contract's BOQ line item. For example, enter: 10%

    • Contractor
      Enter the company name of the primary contractor managing the construction project. If you are setting up the contract, this will typically be your company's name.

    • Architect/engineer
      Select the lead architect for the project from the drop-down list.

    • Description
      Enter a more detailed description of your contract.

    • Attachments
      Attach any relevant files to your contract. For example, you might want to attach a digital copy of your signed contract.

    • Make this visible only to administrators and the following users
      Place a mark in this tickbox to limit visibility to users with 'admin' permission and any users designated in the 'Allow these users to see BOQ items' tickbox.

    • Allow these users to see BOQ items
      Mark this tickbox and select one (1) or multiple users who have 'Read Only' or 'Standard' level permissions on the Main Contracts tool from the drop-down list.

  4. Under Contract dates, do the following:

    • Date created
      Shows the date the contract was created. You cannot change this date.

    • Start date
      Select the construction project's official start date.

    • Estimated completion date
      Select the construction project's estimated completion date from the calendar control.

    • Substantial completion date*
      Select the construction project's practical completion date from the calendar control.

       Tip

      If the 'substantial completion date' field is configured on your project, Procore automatically updates the value in the 'substantial completion date' column to match the 'Revised substantial completion date' from each main contract variation (MCV) after each variation is 'Approved.'

    • Actual completion date
      Select the construction project's actual completion date.

    • Contract date*
      Select the date from the calendar control. This represents the effective date of the contract, which is the date the contract goes into force.

    • Signed contract received date
      Select the date from the calendar control. This represents the date that the executed contract was received.

    • Execution date*
      Select the date from the calendar control. This represents the date the contract was signed by all parties.

    • Issued on date*
      Select the date from the calendar control. This date represents the date the contract was issued to both parties.

    • Returned date
      Select the date from the calendar control.

    • Letter of intent date
      Select the letter of intent date from the calendar control.

    • Approval letter date*
      Select the letter of approval date from the calendar control.

    • Contract termination date
      Select the date from the calendar control. A contract termination date is a date when all parties have met the contract's obligations and terms.

  5. Under Additional information, do the following:

    • Inclusions. Specify any agreed-upon inclusions in the contract.

    • Exclusions. Specify any agreed-upon exclusions in the contract.

  6. Click Create or Create & email.

     Note

    If you clicked create earlier in this process, the Create and Create & email button's labels are Save and Save & email.

Repeat the steps above to create additional contracts.