Create a main contract variation from a change event

Background

If the change event tool is enabled on your project, your project's variation tier configuration setting (see What are the different variation tier setting in Project Financials?) determines the number of steps leading up to creating a main contract variation:

Tips

Are you inviting subcontractors to submit tenders for goods and services using formal RFQs?

If your project team has opted to use the request for quote process (see Create RFQs from a change event), you do not have to wait until the RFQ is complete to create your main contract variations. However, after invited subcontractors and vendors respond to RFQs and its status is set to 'Pending final approval,' Procore does not automatically update the variation's Bill of Quantities (BOQ) with the appropriate amounts from the RFQ.

To learn more about how the RFQ process affects variations, see What are the different RFQ status and how do they affect cost and variation amounts?

Are you using the Revenue ROM function?

If your project team has opted to use the Revenue ROM function, the BOQ on your main contract variations is also automatically updated. If you have hidden the Revenue ROM function, any automatic updates depend upon the scope of the change event:

  • When change events are 'In Scope' or 'TBD', the BOQ on the main contract variation is automatically updated with a £0 value.

  • When change events are 'Out of scope', the BOQ on the main contract variation is automatically updated using the data from the RFQ when the RFQ status is set to 'Pending final approval.'

  • When change events are not in one of the above statuses, the BOQ is automatically updated using the cost ROM.

Things to Consider

  • Required User Permissions:

    • 'Standard' or 'admin' level permission on the project's change event tool.
      AND

    • 'Standard' or 'admin' level permission on the project's main contract tool.

      Notes

      For users with 'Standard' level permissions on the project's Main Contracts tool to perform this task, the following must also be true:

  • Required configuration setting:

  • Additional Information:

    • After you create a change event, you can also create an RFQ to send to the affected subcontractor(s). See Create RFQs.

  • Show/Hide: If your company has enabled the ERP Integrations tool

    If your company has enabled the enterprise resource planning integration tool, keep these things in mind:

    • Quickbooks® desktop: Main Contract Variationexports are NOT supported.

    • Sage 100 Contractor®: Main Contract Variationexports are NOT supported.

    • Sage 300 CRE®:

      • Title. The Main Contract Variation title must be 30 characters or less.

      • Number (#). The Main Contract Variation number must be five (5) characters or less.

      • Status. The Main Contract must be in the Approved status.

      • Associated line item. For each line item that you add to the variation's Bill of Quantities (BOQ), you may designate one (1) associated line item for each variation line item or the same associated line item for all variation line items. Note: The Associated line item list is only visible and available when the ERP Integrations tool has been configured to work with Sage 300 CRE® and the export Main Contract Variation capability has been switched on in Procore by your integration implementation specialist.

    • Trimble® Spectrum: Main Contract Variationexports are NOT supported.

    • Vista®: Main Contract Variation exports are supported.

    • CMiC:

      • Date. Required field.

      • Status. The Main Contract must be in the Approved status.

      • Associated line item. For each line item that you add to the variation's Bill of Quantities (BOQ), you may designate one (1) associated line item for each variation line item or the same associated line item for all variation line items. Note: The Associated line item list is only visible and available when the ERP Integrations tool has been configured to work with CMiC and the export Main Contract Variation capability has been switched on in Procore by your integration implementation specialist.

      • Markups. Horizontal markups are allowed. Vertical markups are not allowed at this time.

Prerequisites

Steps

  1. Navigate to the project's change event tool.

  2. Select one or more change event line item to include in the new variation.

    Note

    Procore uses the selected line items to populate the variation's BOQ.

  3. From the bulk actions drop-down menu:

    • For one (1) tier variations, choose Create prime VAR.
      OR

    • For two (2) or three (3) tier variations, choose Create main contract PV.

  4. Update the General information.

  5. Click Create. Procore creates the variation.

See Also