Create a main contract variation
Background
Use the steps below when you need to create a main contract variation.
Things to Consider
Required User Permissions:
'Admin' level permission on the project's main contract tool.
Additional Information:
If you are using an account where is the Procore + DocuSign© integration enabled, see DocuSign©.
If the change event tool is active in Project tools, you must complete the steps in Create a change event. Then follow the steps in Create a main contract variation from a change event instead of the steps below.
Prerequisites
Steps
Navigate to the project's main contract tool.
Locate the main contract to work with. Then click its Number link.
Click Create main contract VAR.
Complete the following fields:
Sign with DocuSign®If you have enabled the Procore + DocuSign® integration (see Enable or disable the DocuSign® integration on a Procore project), a tick appears in this box by default. If you do NOT want to collect signatures with DocuSign®, remove the mark.
TipHow do you collect signatures with DocuSign? After the data entry for the item is complete, Procore recommends changing the item's status to 'Out for Signature' before clicking the Complete with DocuSign button to launch the DocuSign® application. If you have not previously signed in, you will be prompted to Log in to DocuSign®. Once you are signed in, you can prepare the DocuSign_®_ envelope for signatures. After the signature process is complete, Procore automatically changes the status of the item to 'Approved' and marks the item as 'Executed'. To learn more, see DocuSign®.
#Accept the default number, enter a new number or create a custom numbering scheme for this variation and future ones.
Procore automatically assigns the item a new number in sequential order. For example; 001, 002, 003 and so on.
To use a custom numbering scheme, enter any set of alphanumeric characters. Procore automatically assigns new numbers in sequential order using your custom scheme.