Create main contracts (Beta)

Background

A is a legal agreement between contracted parties. In a single, two-party contract, the party financing the construction project is called the client, owner or principal. The party being paid to ensure completion of work is called the general, primary or main contractor.

In Procore, you can manage a project with either a single or multiple agreements. If the project is large, has multiple funding sources or involves several clients, divide the scope of work into multiple agreements.

If your company has purchased Procore to manage your construction projects, you can create one (1) or more contracts for each new construction project.

Examples

When to create a single main contract

Most customers who manage their construction projects in Procore create a single contract for a single project. For example, if you are a main contractor, creating a single contract is the simplest way to manage a construction project when it has a single project owner and a single funding source. If you are an owner/developer or an internal main contractor with an upstream approval requirement, you might choose to create a single main contract to handle the upstream contract and payment applications.

When to create multiple main contracts

If a project has multiple owner/client, funding source and/or project delivery methods, you can also choose to create multiple contracts for a single project. If you choose to create multiple contracts in a single Procore project, there are some limitations. For details, see Are there any system limitations when projects have multiple main contracts? Reasons to create multiple contracts include:

  • Multiple clients and funding sources. A project can have multiple funding sources or multiple clients. For example, a specialty contractor might choose to create a separate main contract for each client. Or your construction company might have been contracted to complete work on a project with more than one funding stream, such as a private donor, a public grant, a public authority, bonds, grants, loans or a combination of all these examples. See Configure advanced settings: Main contracts.

  • Multiple stages. A project can be divided into stages. For example, you might require separate contracts for pre-construction, course of construction and aftercare/maintenance.

  • Multiple phases. A project can be portioned into phases. For example, you might require separate contracts for the foundation, plumbing, HVAC and so on.

  • Guaranteed maximum price (GMP) contracts. A project can be fast-tracked or a phased GMP job. For example, you might require multiple contracts for each established scope-of-work package.

  • Construction manager as advisor (CMa) delivery methods. A main contractor operating as a CMa might need to manage multiple contracts between an owner and various contractors.

After you create an agreement, you can then update its Bill of Quantities (BOQ). For details, see Update the bill of quantities on a main contract.

 Tip

Is the Bill of Quantities on the contract similar to the line item on the project's budget? If so, Procore recommends creating the project's budget before the contract. To eliminate repetitive data entry, you can use the main contract tool's import feature to Create the main contract Bill of Quantities from the project budget.

Things to Consider

Prerequisites

Create a single main contract

In Procore, you have the option to create a single main contract or multiple main contracts as described below:

Create a single main contract

  1. Navigate to the project's main contract tool.

  2. Choose from these options:

    • If this is the first contract on the project, click Create main contract on the 'Create a main contract to get started' page.
      OR

    • If you have already created at least one (1) main contract, click Create at the top-right of the page. Create A Single Prime Contract

  3. Continue with the next steps:

    • Add the basic contract information

    • Update the general information on the main contract

    • Update the contract access for the main contract

    • Update the contract dates for the main contract

    • Add inclusions and exclusions to the main contract

    • Set the accounting method for the main contract

    • Update the main contract bill of quantities

    • Add line items to the main contract BOQ

    • Import line items to the main contract BOQ from a CSV file

    • Attach files to the main contract

Add the basic contract information

Update the basic contract information as follows:

Create Prime Contract Basic

 Notes
  • There are no required fields when adding the basic contract information.

  • If you click the Create button without completing any data entry, Procore saves the main contract, lists you as the creator and automatically places it in the draft status.

  • Number
    To number your contract(s), choose from these options:

    1. If you number your contracts using a sequential numbering system, you can enter any combination of alpha-numeric characters in this box. For subsequent contracts, Procore automatically applies consecutive numbering in ascending order.

      Example

      The examples below show you how Procore's ascending consecutive numbering works:

      • If the previous contract was 1, the next contracts are 2, 3 and so on.

      • If the previous contract was MC-0001, the next contracts are MC-0002, MC-0003 and so on.

      • If the previous contract was DCA00010-12-G-0001, the next contracts are DCA00010-12-G-0002, DCA00010-12-G-0003 and so on.

    2. If you do NOT number your contracts using sequential numbering, you can manually enter a unique number for each main contract. To do this, type over the existing entry in the Number box. Duplicate contract numbers are NOT permitted.

  • Contract company
    Select the name of the company performing the work or supplying materials for this contract. To appear as a list option, see Add a company to the project Directory.

  • Title
    Type a descriptive name for the contract.

Update the general information on the main contract

Update the contract with more general information:

Create Prime Contract General Information

  • Status
    Procore automatically assigns contracts the 'default' status. To select a different status, choose one of the status labels from the drop-down list. Options include draft, out for tender, out for signature, approved, complete or terminated.

     Note

    To create main contract variations (MCVs) and main contract payment applications, your main contract's status must be set to Approved or Complete.

  • Executed
    Place a mark in this tickbox if the contract has been fully executed. A fully executed contract is a legally effective agreement that has been signed by authorised representatives for each party.

  • Default retention
    Enter a number to represent the percentage that will be withheld as retention on the line items of the contract's Bill of Quantities. For example, if you plan to withhold ten (10) percent of the line item's value, enter 10%.

  • Contractor
    Select the 'Contractor' from this drop-down list. This is the company that your team hired to perform the work. To appear as a list option, Add a company to the Project Directory.

  • Architect/engineer
    Select the lead architect or engineer for the project from this drop-down list. To appear as an option in this list, the company must have a record in the Project Directory.

  • Description
    Enter a more detailed description of the main contract. You can apply the options in the formatting toolbar to your text.

Update 'Contract Access' for the main contract

By default, main contracts are visible to all users with 'Read Only' level permissions or higher on the project's Main Contracts tool. To change its access permissions, do the following on the 'Contract access' card:

  1. Optional: Move the Restrict this contract's visibility to only project admins and select non-admin users toggle to the left or right to turn the restriction OFF and ON. Procore turns this setting ON by default.

     Notes
    • The toggle is BLUE when restrictions are turned ON.

    • The toggle is GREY when restrictions are turned OFF.

  2. Optional: To provide users with 'Read Only' or 'Standard' level permissions on the project's Main Contracts tool with access to the contract, select the person's name from the Access for non-admin users drop-down list. To appear as an option in this list, a user must have a profile in the Project Directory.
    Create Prime Contract Contract Access
    Optional: To provide the users in the 'Access for non-admin users' list with access to view the Bill of Quantities, mark the Allow these non-admin users to view the BOQ items tickbox.

Update the contract dates for the main contract

To update the main contract with important dates, do the following:

Prime Contract Contract Dates

 Note

Your company's Procore administrator manages the dates that appear in the 'Contract Dates' section using the configurable fieldsets feature. For details, see Which fields in the main contract tool can be configured as required, optional or hidden?

  • Start date
    Select the construction project's official start date.

  • Estimated completion date
    Select the construction project's estimated completion date from the calendar control.

  • Substantial completion date
    Select the construction project's practical completion date from the calendar control.

     Tip

    If the 'substantial completion date' field is available on your project, keep in mind that Procore automatically update the 'substantial completion date' to match the 'Revised substantial completion date' from each main contract variation (MCV) when each variation is 'Approved.'

  • Actual completion date
    Select the construction project's actual completion date.

  • Contract date
    Select the contract date from the calendar control.

  • Signed contract received date
    Select the date from the calendar control. The signed contract received represents the date that the executed contract was received.

  • Execution date
    Select the date from the calendar control. The execution date represents the date the agreement was signed by authorised representatives of all contract parties.

  • Issued on date
    Select the date from the calendar control. The issued on date represents the date the contractual agreement was issued to both parties.

  • Returned date
    Select the date from the calendar control. The returned date is the date the contract was returned.

  • Letter of intent date
    Select the letter of intent date from the calendar control.

  • Approval letter date
    Select the letter of approval date from the calendar control.

  • Contract termination date
    Select the date from the calendar control. A contract termination date is a date outlined in the prime where all parties have met all contractual obligations and terms.

  • Delivery date
    Select the date from the calendar control.

Add inclusions and exclusions to the main contract

Contract inclusions and exclusions vary from project to project. However, the intent is to define exactly what is included and NOT included in the contract's price and scope of work. To update the contract's 'Inclusions and exclusions' card, do the following:Create Prime Contract Inclusions Exclusions

  • Inclusions
    Add the contract's inclusions in this box. You can apply the options in the formatting toolbar to your text.

  • Exclusions
    Add the contract's exclusions in this box. You can apply the options in the formatting toolbar to your text.

Set the accounting method

The first step when updating a bill of quantities is to define the accounting method for the contract. The method you choose also applies to all variations and/or payment applications for that contract. The accounting method can only be changed BEFORE you add line items to a BOQ. Procore does NOT permit you to change a contract's accounting method after line items are added.

 Tips
  • What's the difference between the amount based and unit quantity based contract? For details, see How do I set the accounting method for a contract or funding?

  • Is the contract's accounting method automatically applied to a contract's change events? No. If you want your team to enter unit quantity amounts on change events, you must mark the 'Display UoM, Revenue Qty, Revenue Unit Cost, ROM Unit Qty and ROM Unit Cost Columns' tickbox in the Configure settings page of the change event tool. See Configure settings: Change event.

  • Is the contract's accounting method automatically applied to a contract's variations and payment applications? Yes. If you choose an amount based contract, Procore generates amount based variations and payment applications. Similarly, an unit quantity based contract produces unit quantity based variations and payment applications.

  • Does a contract's PDF export file reflect the contract's accounting method? Yes. If you choose an amount based contract, the PDF export file is amount based. Similarly, an unit quantity based generates a unit quantity based PDF export file. If you have an amount based contract and want to include unit quantity information in the PDF export file, your company's Procore administrator must request services from custom solutions.

  • To change the accounting method to unit quantity, click the Change to unit quantity button.

  • To change the accounting method back to amount-based, click the Change to amount based button.

Update the main contract bill of quantities

By default, you can input line item on the contract's BOQ at any time, as long as the contract is NOT in the 'Approved' status.

 Note

Your project team might choose to enable a contract setting, which permits users with edit permissions to the SOV to make changes on the SOV at any time. To learn about this setting, see What is the 'Enable Always Editable Schedule of Values' setting?

Add line items to the main contract BOQ

To manually add line items to the main contract's BOQ:

  1. Choose from these options:

    • If the BOQ is blank, click Add line under 'You have no line items yet'.
      OR

    • If you have existing line item, click Add line.
      Procore creates new line item starting with the number '1'. Subsequent lines are created in numerical order.

  2. Designate a budget code for the new line item. You have these options:

    • To assign an existing budget code to the line item, start typing a code in the Search box and select the matching code from the list.
      OR

    • To create a new budget code for the line item, click the Create budget code button. Next, select the appropriate segment items from the drop-down list(s) to satisfy your project's budget code pattern requirements. Then, click Create.

  3. Depending on the accounting method you are using, choose the appropriate steps for adding a line item:

    • For an amount-based contract:
      An amount-based BOQ requires this data entry:

      1. Budget code
        Select a budget code or click Create budget code. See What is a budget code in Procore's WBS?

      2. Description
        Enter a description for the line item. For example, type: monthly service fee

      3. Amount
        Enter the total amount for the line item.

      4. Billed to date
        Later, when you create payment applications, this column will automatically show the amount that has already been billed to date.

      5. Amount remaining
        Later, when you create payment applications, this column will automatically show the amount that has NOT yet been billed to date.

    • For a unit quantity based contract: A unit quantity based BOQ requires this data entry:

      1. Budget code
        Select a budget code or click Create budget code. See What is a budget code in Procore's WBS?

      2. Description
        Enter a description for the line item. For example, type: monthly service fee

      3. Quantity
        Enter the number of units.

      4. UoM
        Select the Unit of Measure (UoM) from the list. See Which units of measure are included on Procore's master list? and Add a unit of measure to the unit of measure master list.

      5. Unit cost
        Enter the unit cost in this box. You'll notice that the value in this column contains four (4) decimal points (for example, £0.0000) to allow you to enter the specific value required to calculate accurate pricing.

        Example

        If you are buying 50,000 units for £1,006,625.00, you would enter a unit price of £20.1325.

      6. Amount
        The system automatically calculates the subtotal for you, based on the quantity, UoM and unit cost entries.

      7. Billed to date
        Later, when you create payment applications, this column will automatically show the amount that has already been billed to date.

      8. Amount remaining
        Later, when you create payment applications, this column will automatically show the amount that has NOT yet been billed to date.

  4. Optional: Repeat the steps above to add as many line item as needed.

  5. Click Save.
    Procore saves the line item on the contract's BOQ.

Import line items to the main contract BOQ from a CSV file
  1. In the 'Bill of Quantities' card, click the Import BOQ from CSV button. Import Sov From Csv

  2. Click the Download CSV template button and choose one of these options:

    • Blank template. Click this option to download a blank template.
      OR

    • Template with existing line items. Click this option to download a template that includes any existing line item data from your project's Budget.

       Note
      • Procore downloads a CSV template file to your web browser's file download location.

      • The name of the file is: main contract BOQ template.csv

  3. Open the template that you downloaded on your computer.

  4. Enter the data that you want to upload directly into the template.

     Important

    Do NOT change or rearrange the column headings in the template file.

  5. After entering your line item data, make sure to save your file update in the 'Comma Separated Values' file format.

  6. Navigate back to Procore. Then, in the 'CSV file' section, choose one of these options:

    • Click Upload file.
      OR

    • Use a drag-and-drop operation to move the template you just updated into the 'CSV File' section.

  7. Choose one of these options:

    • Add additional line items. Choose this option if you want to create new line items using the data in your template.
      OR

    • Replace existing line items. Choose this option if you want to erase any existing line items from the main contract and replace them with data in your template.

  8. Click Import.

Attach files to the main contract

To add file attachments to a main contract:

  1. On the 'attachments' card, click Edit.

  2. Click Attach files.

  3. In the Attach files dialog box, highlight the location where the files to upload are stored. Options include:

    • My Computer. Click Upload files to open your computer's finder. Select the files to upload and click Open.

    • Photos. If the Photos tool is active on the project, choose the location from the Select album list and then search for the file(s) to upload.

    • Drawings. If the Drawings tool is active on the project, choose the area from the Select area list and then search for the file(s) to upload.

    • Forms. If the Forms tool is active on the project, choose the template from the Select template list and then search for the file(s) to upload.

    • Documents. If the Documents tool is active on the project, navigate to the folder storing the file(s) to upload and then highlight them.

  4. Click Attach.
    Create Prime Contract Attach Files
    A progress indicator shows you the status of the upload.

  5. Click the Close (X) icon on the Attach files dialog box.

Create multiple main contracts

Repeat the steps in Create a single main contract above for each new main contract.

 Caution

There are some important limitations to be aware of before your teams start creating multiple main contracts on a Procore project. For details, you are advised to review What are the limitations when creating multiple main contracts?