Complete a commitment variation with DocuSign®

Background

After you create commitment variation for a commitment, Procore user with a DocuSign® account can prepare a DocuSign® envelope and send the Procore document to the appropriate recipient(s) to request a signature.

Note

You can now use DocuSign® to sign potential variations (PVs).

Things to Consider

  • Required User Permissions:

    • 'Admin' level permissions on the project's Commitments tool.
      AND

    • If the change event tool is added to the project, 'Standard' or 'admin' level permission on the project's change event tool.

  • Additional Information:

Prerequisites

Steps

  • Open the commitment variation in Procore

  • Log in to DocuSign®

  • Prepare the DocuSign® envelope

Note

To collect signatures for a potential variation, see Complete a commitment potential variation with DocuSign®.

Open a commitment variation in Procore

The steps below show you how to open a commitment variation in Procore.

  1. Navigate to the project's Commitments tool.

  2. In the Contracts tab, locate the commitment to work with and click the arrow to expand the commitment's variations.

  3. Click the variation link to open it.

    Expand Commitment Change Orders

  4. In the variation, click Edit.

  5. Mark the Sign with DocuSign tickbox.

    Cco Sign With Docusign Checkbox

  6. Scroll to the bottom of the page and click Complete with DocuSign.

    Cco Complete With Docusign
    Procore launches the DocuSign® web application. If you are NOT logged into your DocuSign® account, you must follow the steps in Log in to DocuSign®. If you are already logged in, proceed to Prepare the DocuSign® envelope.

Log in to DocuSign®

If you are NOT logged into your DocuSign®account when you launch the DocuSign® application from Procore:

 Notes

  1. At the DocuSign® log in page, type your email address in the email box:
    Docusign Login Email

  2. Click Next.

  3. Enter your password.

  4. Click Log in.

Prepare the DocuSign® envelope

Once you are logged into the DocuSign®, the 'Upload a document and add envelope recipient' page appears. Complete these steps:

  • Add documents to the envelope

  • Add recipients to the envelope

  • Add a message to all recipients

  • Preview the signature fields & send the envelope

Add documents to the envelope

The following Procore information automatically populates the DocuSign® envelope:

  1. A PDF copy of the variation is automatically added to the 'Add documents to envelope' section.

  2. The required signature boxes for each 'Role' on the contract. For example, the main contractor or subcontractor whose contract is affected by the variation. This includes each user 'Name' and 'email address.' For more information, see Add recipient to the envelope below.

  3. Optional: If you want to add additional documents to the envelope, choose one of the available options under the 'Add documents to the envelope' section:

    • Upload

    • Use a template

    • Get from cloud


Docusign Add Documents To Envelope

 Note

The available options in the 'Add documents to the envelope' section are developed and maintained by DocuSign®. To learn how to use DocuSign®, Procore recommends reviewing the content on support.docusign.com.

Add recipients to the envelope

To add recipients to the envelope:

  1. Under 'Add recipients to the envelope', keep the default recipient blocks, their names and their email addresses. This data is added to the envelope automatically by the Procore+DocuSign® integration. If the data was specified in Procore, the values in the 'Name' and 'Email address' fields of the recipient blocks correspond to these fields in Procore:

    • Subcontractor. This field automatically populates with the first name, last name and email address of the individual designated as the 'Contract Signer' for the selected 'contract company'.

      For this information to pull correctly, the following must be true:

      • The company must be added to the Project Directory.

      • A specific user must be selected in the 'Contract Signer' dropdown menu on that company’s Directory entry.

    • Main contractor. This the individual who is designated in the 'primary contact' field in the Project Directory for the company designated in the 'Contractor' field of the commitment associated with the variation.

       Tip
      Docusign Add Recipients To The Envelope
       Tip
      • Want to add, change or remove recipient DocuSign®? The options in the 'Add recipient to the envelope' section are developed and maintained by DocuSign®. If you change the recipient information in DocuSign®, keep in mind that any changes made in DocuSign® do NOT update in Procore and can lead to unwanted results. To ensure the integration works as designed, Procore recommends keeping the recipient fields that were added by the integration. To learn how to use DocuSign®, Procore recommends reviewing the content on support.docusign.com.

Add a message to all recipients

  1. In the 'Message to all recipients' section, do the following:
    Message To All Recipients

    • Email subject
      Type a subject line for the outgoing email message.

    • Email message
      Type the content of your outgoing email message.

  2. Click Next.

Preview the signature fields & send the envelope

The next step is to preview the signature fields on the DocuSign® document. The signature fields correspond to specific roles in Procore. For example, the main contractor and subcontractor who are parties on the contract associated with this variation. The Procore + DocuSign® integration automatically adds these fields to the DocuSign® envelope.

  1. Scroll to the bottom of the DocuSign® document, to view the signature fields. An example is pictured below.

    Docusign Signature Fields Send

  2. In the DocuSign® document, leave the signature fields in their default position(s). This ensures the Procore + DocuSign® collection process works as designed.

  3. Optional: Add any 'standard fields' to the form as desired.

     Note

    The options in the 'Standard fields' area are developed and maintained by DocuSign®. To learn how to use DocuSign®, Procore recommends reviewing the content on support.docusign.com.

  4. When you are ready to collect the specified signatures, click Send.
    DocuSign® sends the envelope to the specified recipients. Recipient can then continue with the next step. After the required signatures are applied to the document, Procore's default behaviour is to change the status of the item in Procore to 'Approved'.

     Important
    • If your company has engaged Procore Custom Solutions to create a custom workflow for your Project Financials tool, the status of the item may not be configured to automatically change the status to 'Approved'. To learn how a custom workflow was configured in your environment, contact your company's Procore administrator.

Next Step