Create Assignments

Créer des affectations de ressources à partir du diagramme de Gantt des affectations (Beta)

Note: Les utilisateurs qui se voient confier des missions de cette manière sont également ajoutés au projet dans l’annuaire de l’entreprise.

 In Beta

This feature is in beta and available for customers using the Resource Planning tool.

 Tip

You can also create this by creating a copy of an existing item on the Assignments Gantt.

  1. Accédez à l’outil Planification des ressources au niveau entreprise.

  2. Click Assignments and select Gantt (Beta).

    Tip

    To assign a resource, you can click the start date on the Gantt chart and drag to the end date.

    You can do this in either the Projects or Resources view. New Gantt Resource Project Picker

  3. Dans la liste, cliquez avec le bouton droit de la souris sur le projet, la catégorie ou la sous-catégorie de l’affectation et sélectionnez Nouvelle affectation.
    Note: Vous pouvez également survoler le projet, la catégorie ou la sous-catégorie, cliquer sur les points de suspension Icon Ellipsis Vertical verticaux et sélectionner Nouvelle demande.

  4. Fill out the 'Details' information. Afficher/Masquer les champs

    • Project. The project the assignment is for.

    • Category. The category.

    • Subcategory. The subcategory.

    • Labor. The people you are assigning.
      Note: If you select multiple people, it will create an assignment for each one.

    • Equipment. The equipment you are assigning.
      Note: If you select multiple pieces of equipment, it will create an assignment for each one.

  5. Enter out the 'Schedule' information. Afficher/Masquer les champs

    • Start Date. The date the work assignment starts.

    • End Date. The date the work assignment ends.

    • Time or Allocation.

      • Moving the 'Set Assignment by Start Week and Duration' toggle to the ON Icon Toggle On position allows you to enter the Start Time and End Time for the assignment.

        • Overtime. If an assignment allows for overtime, You can the 'Overtime' toggle to the ON Icon Toggle On position.

          • Overtime Rates. The overtime rate for each day of the week.
            For example, overtime on a weekday may be 1.5 for time and a half, and 2 for double time on the weekend.

          • Pay Split. How many hours a person must work to initiate overtime.

            • Overtime. After the standard wage, how many hours in a shift that are considered overtime.

            • Standard. How many hours in a shift are considered the standard wage.

            • Unpaid. How many hours in a shift are unpaid.

              Example
              • 12 Hour Shift, Paid Lunch - The pay split would be 8 hours standard, and 4 hours of overtime.

              • 12 Hour Shift, Unpaid Lunch - The pay split would be 8 hours standard, 3 hours overtime, and 1 hour unpaid.

      • Moving the 'Set Assignment by Allocation' toggle to the ON Icon Toggle On position allows you to enter the Percent of the person's time that is Allocated for the request.

    • Work Days. A checkmark indicates a work day for the request.

    • Status. The assignment's status.

  6. Remplissez les informations supplémentaires. Voir Configurer des champs personnalisés pour la planification des ressources.

  7. Optionnel: Saisissez Portée des travaux pour décrire la portée des travaux.

  8. Optionnel: Saisissez les directives d’affectation pour fournir des directives supplémentaires.

  9. Optionnel: Saisissez des commentaires.

  10. Cliquez sur Créer.

 Pourboire

Cliquez sur l’icône Annuler Icon Gantt Undo pour annuler une action. Cliquez sur l’icône Rétablir Icon Gantt Redo pour rétablir une action précédemment annulée.