Effectuer une inspection
Things to Consider
If the inspection is private, you must be added as an assignee to perform the inspection.
Prerequisites
Steps
Tip
To save time, use the TAB and ENTER keys on your keyboard to switch between sections and buttons.
When you press TAB, it will save your input and move to the next section or button.
When you press ENTER, it will activate the button you are on.
Navigate to the Project level Inspections tool.
Click View next to the inspection you want to perform.
Scroll down to the 'Inspection Items' section. Respond to the items or sections according to their response option.
Each inspection item has an activity feed that includes the following information: Response Changes, Attachments, Photos, Comments, and Observations.
If an item requires a signature, you may need additional permissions to create a contact if they are not already in your Directory. See Inspection User Permissions.
To skip an entire section during an inspection, turn on the Mark section as N/A toggle. This collapses the section and changes all items within it to 'N/A' (overriding any existing statuses). Turning the toggle off clears the 'N/A' status from the items. All status changes are recorded in the item's history.
Optional: Add comments to an inspection item.
Optional: Add attachments to an inspection item.
Optional: Create an observation from an inspection.
As you perform the inspection, the wheel at the top of the page will provide a breakdown of your responses.