Delete Custom Segments
Things to Consider
Required User Permissions:
'Admin' level permissions on the Company level Admin tool.
Additional Information:
A custom segment cannot be deleted after it has been added to the
on one (1) or more projects in your company's Procore account.预算编号结构是细分用于根据组织建立的模式构建有意义的预算编号。在 Procore 的工作分解结构中,公司或项目的预算编号结构可以由多个部分组成。
A Procore
cannot be deleted.In Procore, a segment is a discrete category that an organization uses to break down its work into manageable components. A default segment is one that is automatically provided for use with your Procore company account. Procore's WBS has two required default segments: cost code and cost type. It also has an optional default segment: sub job.
For companies using the
ERP Integrations tool: Show/HideCustom Segments are NOT supported with the ERP Integrations tool.
先决条件
Steps
Navigate to the Company level Admin tool.
Under 'Company Settings', click the Work Breakdown Structure link.
In the 'Segments' table, locate the segment to delete.
注意事项无法删除 Procore 的默认细分。
将自定义细分添加到一(1)个或多个项目的预算编号结构后,便无法删除该自定义细分。
如果将细分添加到细分,项的总数将显示在"细分"表的"项"列中。
Click the vertical ellipsis
and choose Delete from the Overflow menu.
In the 'Delete Segment?' popup window, click the Delete button to confirm the removal action. This permanently deletes the segment from Procore. The segment cannot be recovered.